Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Different Size of Auger Drill Bit

Price $4.20
Min Order 10 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 293 people viewed
Model NO.:
SB25, Sb30, SB35, SB45, SB60, SB70, SB120
Customized:
Customized
Length:
Customized
Type:
Twist Drill Bit
Material:
Tungsten Carbide
Usage:
Metal Drilling
Color:
Yeloow Plated
Packing:
Wooden Box
Lead Time:
25-30 Days for Sample
Logo:
Customized
Trademark:
HY
Transport Package:
as customer request
Specification:
SB25, SB35
Origin:
Ningbo
HS Code:
84314320
Product Description
Different size of Auger drill Bit

material : 42CrMo.
process: investment casting + machining + heat treatment + welding .
carbide tungsten
surface : color zinc plated.
hardness: HRC42-48
Min.10pcs.
packing : wooden packing.

Our factory is professional in producing forging, we have done these for more than 10 years. We can product all kinds of forging. Please give us your drawing.

Ningbo huiyun Machinery co.,ltd is a professional auger attachment manufacturer.Focus on auger drive, earth auger and auger parts.With about 10years development, the company have workshops as casting, forging, machining, wleding, packing, as well as inspection lab. All the machine and process keep the qualify products and make sure satisfactory to our customers.The company have take part in the Exhibition of Bauma Shanghai 2010 ,2012,2014,.....The company export products to USA,Canada ,Austulia ,Russia and so on.



FAQ:

1.Are you a manufacturer or a trading company?
We are a 2000-square-meter factory located in zhejiang, China.

2.Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

3.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.

4.Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.

5.How about the lead time?
Generally, 2-3 weeks for samples, 4-5 weeks for mass production.
  • Similar Products
Full Page Contact Supplier