Swipe or use the arrows to view product images.
Double Pitch Roller Chain Sprockets From China Manufacturer Scs
| Price | $50.00 |
|---|---|
| Min Order | 500 Pieces |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 377 people viewed |
Model NO.:
Standard
Standard Or Nonstandard:
Standard
Application:
Motor, Motorcycle, Machinery, Toy, Agricultural Machinery, Car
Hardness:
Hardened Tooth Surface
Manufacturing Method:
Forging Parts
Toothed Portion Shape:
Standard
Material:
Steel, Carbon Steel
Type:
Standard Sprocket
Teeth:
9t-120t
Processing:
Forging-Machining-Hobbing-Teeth Harden-Tempering
OEM:
Scs Offers OEM Service
Lead Time:
45 Days After Advance Payment
Heat Treatment:
High Frequency Induction Hardening and Tempering
Surface Treatment:
as Required
Place of Origin:
Jiangsu, China
Trademark:
SCS
Transport Package:
Plywood Cases
Specification:
JIS
Origin:
Changzhou, Jiangsu
HS Code:
8483900090
Product Description
Double pitch roller chain sprockets from China manufacturer SCS
With more than 20 years' experience, high-precision equipment and strict management system, SCS can provide sprockets, gears, shafts, flanges and related transmission parts for you with stable quality and best service.
Q1: What information will be highly appreciated for a quotation?
A: It will be preferred if you can offer us the drawings, heat treatment and surface treatment requirements, required quantity, quoted currency (USD or EUR), or samples.
Q2: Are you a trading company or factory?
A: SCS is a factory located in Changzhou, Jiangsu.
Q3: What is your terms of payment?
A: T/T 50% in advance, and 50% before shipment. We'll show you the photos of the products and packages before you pay the balance.
Q4: Do you test all your goods before delivery?
A: Yes, SCS has adopted a strict quality management system and all the items will be inspected according to the inspection instruction with good inspection records.
Q5: Is there any customer that has assessed your quality management system?
A:Yes, SCS has passed the audit of many customers, such as Mitsubishi, CLAAS, Kardex and so on.
Q6: How does your company ensure the quality of the raw material?
A: The steels are purchased from our domestic well-known steel mills. After receiving the raw material, the steel will be inspected by spectrograph imported from Germany. Besides, the furnace number of steel will be well-managed in our ERP system to ensure the traceablity of our products.
Q7: How do you ensure the high quality of products?
A: With integral manufacturing processes, a strict quality control system and imported machines, we can manufacture high quality products.
Q8: What are your terms of delivery?
A: EXW, FOB Shanghai.
Q9: How about your lead time?
A: Normally it will take 45 days after receiving your advance payment. The specific lead time depends on the items and the quantity of your order.
With more than 20 years' experience, high-precision equipment and strict management system, SCS can provide sprockets, gears, shafts, flanges and related transmission parts for you with stable quality and best service.
Q1: What information will be highly appreciated for a quotation?
A: It will be preferred if you can offer us the drawings, heat treatment and surface treatment requirements, required quantity, quoted currency (USD or EUR), or samples.
Q2: Are you a trading company or factory?
A: SCS is a factory located in Changzhou, Jiangsu.
Q3: What is your terms of payment?
A: T/T 50% in advance, and 50% before shipment. We'll show you the photos of the products and packages before you pay the balance.
Q4: Do you test all your goods before delivery?
A: Yes, SCS has adopted a strict quality management system and all the items will be inspected according to the inspection instruction with good inspection records.
Q5: Is there any customer that has assessed your quality management system?
A:Yes, SCS has passed the audit of many customers, such as Mitsubishi, CLAAS, Kardex and so on.
Q6: How does your company ensure the quality of the raw material?
A: The steels are purchased from our domestic well-known steel mills. After receiving the raw material, the steel will be inspected by spectrograph imported from Germany. Besides, the furnace number of steel will be well-managed in our ERP system to ensure the traceablity of our products.
Q7: How do you ensure the high quality of products?
A: With integral manufacturing processes, a strict quality control system and imported machines, we can manufacture high quality products.
Q8: What are your terms of delivery?
A: EXW, FOB Shanghai.
Q9: How about your lead time?
A: Normally it will take 45 days after receiving your advance payment. The specific lead time depends on the items and the quantity of your order.
- Similar Products
Negotiable
50 Pieces (MOQ)
ISO Standard Single Kb-Type Chain Wheel (Welding hub)
Hangzhou Donghua Power Transmission Imp. & Exp. Co., Ltd.
$10000.00
200 Pieces (MOQ)
High-Performance Torque Limiter Chain Coupling for Heavy-Duty Applications
Zhejiang Cenfit Machinery Co., Ltd.