Swipe or use the arrows to view product images.
Drop Forged System Scaffolding Accessories Ringlock Scaffold Plug
| Price | $1.60 |
|---|---|
| Min Order | 1000 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 301 people viewed |
Model NO.:
drop forged
Material:
Steel
Type:
Mobile
Structural Style:
Wedge Pin
Supporting Mode:
Floor Type Scaffolding
Lapping Form:
Cross Ring Scaffolding
Move Method:
Integral Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Frames
Construction Properties:
Building Scaffold
Package:
Carton or Poly Bay
Transport Package:
Bag
Specification:
7 TO 9
Origin:
Shandong, China
HS Code:
732690
Product Description
Qingdao Dewell Metals International Co.,ltd is an international corporation ranking among the leaders on the market of rigging hardware and ornamental products. Our company's credo is providing our partners and their clients with high quality products at reasonable prices.
Our products:
Rigging Hardware Series:Chain,Anchor,Steel wire rope and their accessory:Shackle,Turnbuckle,Wire rope clip,Thimble,Hook,Connecting Link,Master Link,Quick link,Eyebolt and Eye nut,Swivel,Load binder etc.
Ornamental products:Forging and casting spears,Bushes,Scrolls,Post tops,Leaves,Gate fittings,Balcony bar etc.
Building Hardware:Hinge,Wire Netting,Scaffold,Formwork,Connect Fitting etc.
Factors of Success:
-more than 20 years of market presence.
-Own factories in China.
-Developed sales network at all market segments.
-Design of innovative product groups.
-Excellent conditions for mutually beneficial partnership.
-Introduction of innovative technologies in sales, logistics and stock count.
Business FAQ:
1.Could you supply free samples before we place firm order
Yes,we're glad to sent samples for your inspection.After getting your approval for our samples quality,you place firm order with us.
2.What's your MOQ?
It depends on different products.If it is our regular product,we don't have MOQ.If it is new design products,we have the different MOQ as per different sizes and items
3.What's the delivery time?
About 30days after receiving your firm order or deposit.
4.What's the payment term?
-30% TT deposit,the balance before shipment for the first cooperation.
-Irrevocable L/C at sight.
-D/P at sight available for old customers
5.What's the packing method?
We have variety packing methods,you can make a choice before you place order with us.
We also can follow your requirements about packing,supply your personal package.
- Similar Products
$1.26
100 Pieces (MOQ)
Portable Formwork Frame Scaffolding Spring Lock Pin for Sale
Nanjing Uni-Tech Metalwork Co.,Ltd
$11.90
100 Pieces (MOQ)
Iron Italian Style Shoring Props for Construction
Foshan Scaffoldinghome Co., Ltd.
$5.00
100 Pieces (MOQ)
Scaffolding Prop Accessories-- G Pin
Laian Golden Resource Metalwork Co., Ltd