Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Durable Industrial Steel Pipe Solutions for Global Buyers

Price $1200.00
Min Order 10 Tons
Availability In Stock
Shipping From Fujian, China
Popularity 349 people viewed
Model NO.:
OD 15-75mm
After-sales Service:
Free
Warranty:
Free
Type:
Seamless
Technique:
Cold Drawn
Material:
Carbon Steel
Surface Treatment:
Oiled
Usage:
Hydraulic/Automobile Pipe, Machinery Industry, Special Purpose
Section Shape:
Round
IATF16949:
Yes
Od:
15-80mm
Thickness:
1-20mm
Customized:
Yes
Trademark:
bluesky pipe
Transport Package:
Bund
Origin:
China
HS Code:
7304319000
Product Description
Company Profile

Fujian Bluesky Pipe Manufacturing Co., Ltd., renowned for its legacy as Zhejiang Bluesky Steel Pipe Manufacturing Co., Ltd., proudly relocated to the vibrant and industrious Wendu Industrial Zone, in the thriving city of Fuding back in 2013. The company impressively occupies a sprawling area of 26,600 m²,boasting an expansiveconstruction area of 11,800 m². We have been dedicated to mastering the art of producing seamless steel tubes and pipes for over 30 years.
Certifications

 


Material10#-45#, 16Mn, A53-A369, Cr-Mo alloy, Q195-Q345, ST35-ST52, 10#, 20#, 45#,  16Mn, A213, A315, 30CrMo, Q195, Q215, Q235, Q345, ST35, St37, St45, St52
SurfaceBlack/ Bright
StandardDIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094- 2000, GB/T3639, JIS G3101
SizeOD 15mm-75mm
Thickness 1-14mm
ProcessingCold rolled/ Cold drawn
1. BK (+C)  No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass ( cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled  atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the  upper transformation point in a controlled atmosphere.
PackingWoven bag/ Wooden or crate carton/ Bundle Packing/ Plain end or vanished as per  customer's request.
Delivery timeNormally 20-30 working days


precision seamless steel pipe,Suitable for auto parts or motorcycle parts 
  • Similar Products
Full Page Contact Supplier