Swipe or use the arrows to view product images.
Durable Industrial Steel Pipe Solutions for Global Buyers
| Price | $1200.00 |
|---|---|
| Min Order | 10 Tons |
| Availability | In Stock |
| Shipping From | Fujian, China |
| Popularity | 349 people viewed |
Model NO.:
OD 15-75mm
After-sales Service:
Free
Warranty:
Free
Type:
Seamless
Technique:
Cold Drawn
Material:
Carbon Steel
Surface Treatment:
Oiled
Usage:
Hydraulic/Automobile Pipe, Machinery Industry, Special Purpose
Section Shape:
Round
IATF16949:
Yes
Od:
15-80mm
Thickness:
1-20mm
Customized:
Yes
Trademark:
bluesky pipe
Transport Package:
Bund
Origin:
China
HS Code:
7304319000
Product Description
Fujian Bluesky Pipe Manufacturing Co., Ltd., renowned for its legacy as Zhejiang Bluesky Steel Pipe Manufacturing Co., Ltd., proudly relocated to the vibrant and industrious Wendu Industrial Zone, in the thriving city of Fuding back in 2013. The company impressively occupies a sprawling area of 26,600 m²,boasting an expansiveconstruction area of 11,800 m². We have been dedicated to mastering the art of producing seamless steel tubes and pipes for over 30 years.
| Material | 10#-45#, 16Mn, A53-A369, Cr-Mo alloy, Q195-Q345, ST35-ST52, 10#, 20#, 45#, 16Mn, A213, A315, 30CrMo, Q195, Q215, Q235, Q345, ST35, St37, St45, St52 |
| Surface | Black/ Bright |
| Standard | DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094- 2000, GB/T3639, JIS G3101 |
| Size | OD 15mm-75mm |
| Thickness 1-14mm | |
| Processing | Cold rolled/ Cold drawn |
| 1. BK (+C) No heat treatment after last cold forming process. | |
| 2. BKW (+LC) After last heat treatment there is a light finishing pass ( cold drawing) | |
| 3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. | |
| 4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. | |
| 5. NBK (+N) After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere. | |
| Packing | Woven bag/ Wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. |
| Delivery time | Normally 20-30 working days |
precision seamless steel pipe,Suitable for auto parts or motorcycle parts
- Similar Products