Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Easily Assembled Warehouse Construction Welding Steel Structure Steel Frame

Price $40.00
Min Order 10 Square Meters
Availability In Stock
Shipping From Hebei, China
Popularity 312 people viewed
Model NO.:
OEM
Standard:
GB, EN, China GB Code, JIS Code, ASME
Surface Treatment:
Powder Coated
Energy Source:
Electric Arc
Material:
Aluminum Plate
Type:
Fusion Welding
Tolerance:
0.01mm
Material Thickness:
1--8mm
Color:
as Per Your Request
Lead Time:
30--50 Days
Certificates:
ISO 9001, Ts16949; SGS
Trademark:
GIONLEE
Transport Package:
Plastic Film, Pallet
Specification:
Customized
Origin:
Hebei China
Product Description
Product Description
Specifications:
1) Main Steel: Q345, Q235, Q345B, Q235B etc.                    
2) Column & Beam: Welded or Hot rolled H-section
3) Connection method of steel structure: welding connection or bolt connection
4) Wall & Roof: EPS, Rockwool, PU sandwich, corrugated steel sheet
5) Door: Rolled up door or Sliding door
6) Window: Plastic steel or Aluminum alloy window
7) Surface: Hot dip galvanized or painted
8) Crane: 5MT, 10MT, 15MT and more
Drawings & Quotation:
1) Customized design is welcomed.
2) In order to give you an exactly quotation and drawings, please let us know length, width, eave height and local weather. We will quote for you promptly.


Product Picture











Packaging & Shipping




Method 1: Shrink film, then bulk loading
 
 Method 2: Shrink film + box + pallet/ wooden case
 
 Method 3: PP + wooden case
 
 Method 4: As per customers' requirements or negotiated

workshop Display



Certificates







FAQ:

Q: Are you trading company or manufacturer ?
A: We are a customized factory.
Q: How long is your delivery time?
A: Generally it is 15-20 days for samples and 25-30 days for mass production, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: How do you ship the goods?
A: We have our cooperation forwarder, they can deliver the goods to you in very short time with competitive price, and you can ship by your own agent as your convenience.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. 
    Payment>=1000USD, 30% T/T + 50% Mold Fees in advance, balance before shippment.
B: FOB Tianjin/Beijing. Or EXW, CIF, DUU, ETC



 



 

 

  • Similar Products
Full Page Contact Supplier