Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Ecomonic Price Belt Type Glass Edge Grinding Machine for Glass Processing

Price $800.00
Min Order 1 Piece
Availability In Stock
Shipping From Shandong, China
Popularity 472 people viewed
Model NO.:
JMB95
After-sales Service:
24hours Video Service for Technical
Warranty:
12months
Condition:
New
Certification:
CE
Automatic Grade:
Semi-Automatic
CNC or Not:
not CNC
Voltage:
380V
Application:
Polish Glass Edge
Motor:
0.75wx2
The Max Size of Glass:
1800X1500mm
The Min Size of Glass:
350X350mm
Trademark:
MAG
Transport Package:
by Non-Fumagation Plywood Case
Specification:
Machine size: 2900x1800x1260mm
Origin:
Jinan
HS Code:
84752990
Product Description
         Insulating glass production Machine Glass Edging Machine With Water Spary
Product Description

 

Ac powerAC380V    50Hz
Motor0.75KW×2sets
The maximum size of edging1800*1500mm
 
The minimum size of edging350*350mm
Wheel TypeD150*d32*20mm
Dimension L2900×W1800×H1260mm
Detailed Photos

 

Certifications

Packaging & Shipping

FAQ

1. Are you a manufacturer?
     Yes,we have been in providing the professional products in this field more than 20 years.
2. how to install the machine ?
     we can intrust the install the machine by vedio, email ,picture.....if large project ,
     we can arrange the worker help you to install it in your country .
3. How you pack the products ?
        Normally as the export standard packaging or as you required.
4. What is your available port of shipment?
      Qingdao port,shanghai,tianjin,guangzhou etc.
5. Is customized available ?
     Yes, according to your detailed drawings you provide
6. After Sale Service
      24 hours technical support by phone, email or skype (email or skype) . 
      12 months warranty period.
      Our senior engineer is available to travel aboard, help the installation, maintenance and training staff. 
      By offering this support, we make sure the customer start the business smoothly,
      to realize win-win cooperation
7. Are you trading company or manufacturer ?
     We are factory and welcome to visit us at any time.
8. How long is your delivery time?
      Generally single tanks need 7-15 days, for whole plant need 15-30days.
9.Do you have CE and ISO certification?
       Yes.
10.What is your terms of payment ?
       Free contact for the most suitable machine
       Free professional design for each customer especially.
        L/C, 30% deposit by T/T,70% spare payment L/C. 
        T/T, 30% deposit by T/T,70% spare payment before shipment.
        Western Union or Paypal.

Customers

Exhibition





 
  • Similar Products
Full Page Contact Supplier