Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Electric Kettle Cover The Final Assembly of Electric Components

Price $1.15
Min Order 10000000 Pieces
Availability Insufficient stock
Shipping From Zhejiang, China
Popularity 326 people viewed
Model NO.:
stamping parts
After-sales Service:
Online Technology Support
Type:
Hot Stamping
Processing Type:
Shaping Metal
Material:
Any Metal
Mould:
Multistep Progressive Dies
Surface Processing:
Electroplating
Fine Blanking:
Multi-Position
Process:
Forming Process
Industry:
Metal Stamping Parts
Tolerances:
0.02mm
Customized:
Customized
Trademark:
bosswinn
Transport Package:
Carton, Pallet
Specification:
100 x 100 x150
Origin:
China
Product Description



Our products show 
 
Workcraft CNC punching machining & stamping, laser cutting, bending, threading, welding, deep drawing, polishing, tapping, riveting, final assembly. 
Materials we can process onany steel sheet, copper, aluminum, brass, iron
Surface TreatmentBrushing, sand blastig, electroplating (zinc  , nickel , chrome  coating)    Powder coating, polishing(mirror polishing, electrolytic polishing), 
Tolerancethe best can be +/-0.01mm
Packingcarton, pallet
Applicationelectrics , Vehicles,  Construction Machineries Engineering Machineries, Food Machineries, 
Quality Controlwe have testing tooling or can apply different tests from the 3rd party
Technical File FormatsSolidworks, PRO/E, Auto CAD, PDF, Step, Stp, Dwg, Drw, Prt, etc
Inspections to work IQC, PQC, FQC, OQA







Technology capabilities
We work as per AUTOCAD, PRO-E, Solidworks , UG. 3D max WORKS and other 2D & 3D softwares. can  design,develop,produce and deliver your PO according to your drawings, samples or just an idea. control of non-standard products and OEM  products.




Quality Control

1.  IQC,   incoming quality control
2.Check  the details before the production line operated
3.IPQC, have full inspection and routing inspection during mass production 
4.FQC, check  the goods after they are finished 
5.OQC,check  the goods  before the delivery


 
FAQ
1.Is Bosswinn a  manufacturer ?

A: We are a manufacturer, the business owner has 2 factories producing springs, machining part, stamping parts

2. When is the delivery time?

A: 10 and 15 days , one month in the peak seasons


3. What is the MOQ?

For the initial order , any quantity ok. For the mass production order, 10000 pcs better.

4. What's your payment method?

 : T/T, L/C, Western Unions, 

5. How can we confirm the samples?

Free samples are offered, 
  • Similar Products
Full Page Contact Supplier