Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Esdk1201 New Arrival High Quality Car Subwoofer Speaker

Price $90.00
Min Order 50 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 467 people viewed
Model NO.:
ESDK1201
Type:
Speaker
Speaker Design:
MID Range
Shape:
Basin-shaped
Material:
Aluminum
Sound Frequency:
Low Pitch
Voltage:
12V
Connection Mode:
Double Wire
Current:
3A
Contact Point:
With Contact Point
Energy Exchanging Mechanism:
Electrical
Trademark:
ESOUND
Transport Package:
Carton Box
Specification:
12"
Origin:
China
HS Code:
8518290000
Product Description

 
SPECIFICATION
12 " Woofer , Aluminum basket
VC  size:3"
Magnet Type190*90*20*3PC/230oz
Sensitivity:90dB
Nominal impedance2*2ohm
FS20 Hz
DC Resistance series1.8 ohm
Power(RMS):2000W
Power(MAX):4000W
Frequency Range:20K-800Hz
N.W/G.W: 
CBM/Ctn37*37*21CM








Q: What are the main markets of your products ? 

A: Our main markets are: India, USA, South American, Europe, etc.

 

Q: Do your company have CQC program? 

A: Yes, we have strictly quality control- CQC, ROHS, SASO. Every step in the production process must 

pass quality control inspections. From raw materials to final production and packing, every stage is 

inspected to make sure it meets your requirements. Inspection with every sections and reports offered 

during the whole production and 100% grantee quality before shipment. 

 

Q: What are the payment terms and conditions? 

A: We do require 30% payment to commence production and 70% payment to release goods for 

shipping(it's up to different order and countries).

 

Q: Can you make custom produce? 

A: Yes. We have our own professional R&D department. We can develop the new product as your 

artwork or ideas.

 

Q: Can Pro Production Solutions do large scale production ? 

A: Pro Production Solutions specialize in large and small scale production ranging from 6000+ 

pieces per style, down to 100 pieces.

 

Q: What is your MOQ and delivery time?

A: MOQ is according to the size the value of the produce. Lead Time: Normally we need 3- 6 weeks

to finish the complete product productions (it's up to different products).



  • Similar Products
Full Page Contact Supplier