Swipe or use the arrows to view product images.
European Standard Steel Layher Allround Ringlock System Scaffolding for Shoring Building Material
| Price | $20.00 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 352 people viewed |
Model NO.:
ST369
After-sales Service:
Technical Support
Warranty:
1 Year
Material:
Steel
Type:
Fixed or Removable
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Projecting Scaffolding
Lapping Form:
Installed and Fixed
Erection Position:
External or Internal Scaffolding
Move Method:
Installed and Fixed
Scaffolding Part Type:
Scaffolding Parts
Construction Properties:
Installation or Building Scaffolding
Surface Treatment:
Hot Dipped Galvanized/Pre-Galvanized
OEM/ODM:
Available
Validity:
More Than 15 Years
Thickness:
2.75mm/3.2mm
Delivery:
About 10-20 Days After Deposit
Factory Certificate:
ISO9001 ISO4001 ISO45001
Certificate:
CE/SGS
Application:
Building/Tunnel/Bridge Construction
Raw Material:
Steel Q345b, Q235B
Color:
Silver Red Blue Grey
Connect Method:
Wedge Lock/Ring Lock
Way of Quoting:
by Piece or by Weight
Sample:
Available
Business Type:
Manufacturer and Exporter
Loading Port:
Tianjin or Qingdao
Trademark:
HDRL
Transport Package:
Steel Rack
Specification:
500mm 1000mm 1500mm 2000mm 2500mm 3000mm
Origin:
China
HS Code:
73084000
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS certification.
Q5: Can I get some samples?
A: Yes, usually the customer will pay for the cost and freight charge.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
- Similar Products
$30.00
200 Sets (MOQ)
Universal Frame Scaffolding in Slab Formwork Support
HORIZON FORMWORK CO., LTD.