Experienced Aluminum Alloy Die Casting Auto Pump Parts
| Price | $15.00 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 432 people viewed |
Manufacture Process:
Drawing or Sample → Making Mould → Making samples → Casting→ Burring → Second Processing(CNC, Milling, Drilling, Grinding etc.)→Surface treatment(Polishing, Anodized, Powder Coating, Painting, E-blacking)→ Assembly and Packing→Shipping
| More than 15-year experience in casting and machining. |
| One-stop service,from mould design, casting, machining to surface treatment |
| Abundant technology force, steady production and inspection, professional after-sales service. |
| ISO9001, SGS, TS16949 certificate |
| Professional inspection equipment, three coordinate, X-ray flaw detector, salt spray testing machine, pressure testing machining, hardness tester,etc. |
| Rich experience in exporting to more than 30 countries |
| DDU and DAP service can be supplied accordingly. |
| Reply within 12 hours |
Quality Control:
4 necessary inspection are required to each order, to ensure the steady quality to every partner.
|
|
|
|
| *Q1: What is the MOQ? |
| A: MOQ depends on customers' needs, trial orders are also welcomed before mass-production. |
| *Q2: How long is the mass production? |
| A: It varies depending on product dimension,technical requirements and quantities. Lead time usually needs 25-35days. |
| *Q3: What should I do to get a quote ? |
| A: Please send us 2D or 3D drawings (with material, dimension, tolerance, surface treatment and other technical requirement etc.) ,quantity, application or samples,more detailed information will be big help to us. Then price will be offered within 24h. |
| *Q4: How to know how is my order going on without visiting your company? |
| A: Detailed production schedule and weekly reports with digital pictures and videos which show the machining progress, will be sent to you. |
| *Q5: How can we process the order? |
| A: After confirming the order,Proforma invoice and payment list for deposit will be sent to you accordingly . After receiving your deposit, production will be arranged accordingly at once and finish goods about 25-3days based on different quantities. |
| *Q6: What payment terms do you accept? |
| A: T/T, L/C, Paypal, western union, etc. |
- Similar Products