Swipe or use the arrows to view product images.
Exterior Concrete Wall Panel Gypsum Board Production Line
| Price | $2000000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Henan, China |
| Popularity | 283 people viewed |
Model NO.:
AM1727
Product Type:
Fiber Cement Board Production Line
Automatic Grade:
Automatic
Power Source:
Electric
Screw Design:
Double-Screw
Certification:
CE, ISO
Condition:
New
Customized:
Customized
Application:
Fiber Cement Board Production Line
Forming Board Style:
Hatchek Style and Flow-on Slurry Style
Silo Tanks Request:
Cement Silos,Fly Ash Silo,Clean Water Silo,Recycle
Asbestos:
No Asbestos
Paper Pulp System:
Refinery and Paper Pulp System
Stacker:
Automatic Stacker ,Automatic Demoulding Stacker
Drying Style:
Autoclave or Pressing Machine
Separate Dryer:
If Cold Area,Separate Dryer Is Needed
Edge:
Automatic Edge Treatment Machine
Sanding:
Automatic Sanding Machine
Embossed Style:
Embossed Moulds or Forming Board Roller Design
UV Board:
UV Painted Production Line
Trademark:
Amulite
Transport Package:
Bulk and Wooden Pallet
Specification:
1220X2440X4MM-30MM
Origin:
China
HS Code:
8474802000
Product Description
Fiber Cement Board Production Line
1.1 Main Production Line Specifications: LXWXT:2440X1220X4-30mm(Product With Specical Specifications Can Also Be Produced As Per Requirement Of The Customer)
1.3 Other
Theoretical Capacity: 3,000,000-10,000,000 Sq.M Per Year (Based On 1220x2440x6MM)
Pre-Curing Time:8h
Daily Production Time: 22h
Number Of Autoclaves: 3 Autoclave Specifications: Φ2X26.5m
Autoclave Working Time: 24h Continuous
Maintenance Autoclave Cycle:16 Hours On Average (According To The Valuation Of Similar Factories, The Specific Materials Will Be Determined In Laboratory Tests After The Raw Materials Are Determined)
Main Raw Material Reserves: Fibers Meet The 7-Day Consumption; Powder Materials Such As Cement And Quartz Powder Meet The 3-Day Consumption. The Details Need To Be Discussed.
Theoretical Capacity: 3,000,000-10,000,000 Sq.M Per Year (Based On 1220x2440x6MM)
Pre-Curing Time:8h
Daily Production Time: 22h
Number Of Autoclaves: 3 Autoclave Specifications: Φ2X26.5m
Autoclave Working Time: 24h Continuous
Maintenance Autoclave Cycle:16 Hours On Average (According To The Valuation Of Similar Factories, The Specific Materials Will Be Determined In Laboratory Tests After The Raw Materials Are Determined)
Main Raw Material Reserves: Fibers Meet The 7-Day Consumption; Powder Materials Such As Cement And Quartz Powder Meet The 3-Day Consumption. The Details Need To Be Discussed.
Q: Are You A Manufacturer Or A Trading Company?
A: We Are A Manufacturer With 36 Years Of Experience And An International Trade Team. We Own A 50,000 Square Meter Manufacturing Factory And We Have About 150 Workers.
Q: Which Loading Port?
A: Ports: Tianjin, Qingdao, Shanghai, Lianyuan Port, Shenzhen, Guangzhou, Etc.
Q: Can You Provide Customized Equipment?
A: Customized Equipment Can Be Provided According To Customer Requirements. We Can Print Your LOGO Or Information On The Machinery Or Packaging.
Q: What Payment Method Do You Usually Use?
A: Payment Terms: 30% Advance Payment, 65% Payment Before Loading, 5% Payment Within 30 Days After Installation.
Q: What Is The Delivery Time Of Your Equipment?
A: About 120-150 Days.
Q: How Do You Guarantee Product Quality?
A: We Have Strict Quality Control Checks In Each Process. There Are Test Reports Of Our Products. All Our Products Comply With Industry Standards.
Q: Do You Provide Engineer Installation And Commissioning Services? How Long Does It Take To Install And Commission?
A: Yes, We Have A Team Of 50 Engineers Around The World Responsible For Installation And Commissioning Services. Installation And Commissioning Take About 90-120 Days.
A: We Are A Manufacturer With 36 Years Of Experience And An International Trade Team. We Own A 50,000 Square Meter Manufacturing Factory And We Have About 150 Workers.
Q: Which Loading Port?
A: Ports: Tianjin, Qingdao, Shanghai, Lianyuan Port, Shenzhen, Guangzhou, Etc.
Q: Can You Provide Customized Equipment?
A: Customized Equipment Can Be Provided According To Customer Requirements. We Can Print Your LOGO Or Information On The Machinery Or Packaging.
Q: What Payment Method Do You Usually Use?
A: Payment Terms: 30% Advance Payment, 65% Payment Before Loading, 5% Payment Within 30 Days After Installation.
Q: What Is The Delivery Time Of Your Equipment?
A: About 120-150 Days.
Q: How Do You Guarantee Product Quality?
A: We Have Strict Quality Control Checks In Each Process. There Are Test Reports Of Our Products. All Our Products Comply With Industry Standards.
Q: Do You Provide Engineer Installation And Commissioning Services? How Long Does It Take To Install And Commission?
A: Yes, We Have A Team Of 50 Engineers Around The World Responsible For Installation And Commissioning Services. Installation And Commissioning Take About 90-120 Days.
- Similar Products
$40000.00
1 Piece (MOQ)
Fully Automated MGO Board Manufacturing Making Machine
Yurui (Shandong) Machinery Co., Ltd.