$22000.00
1 Piece (MOQ)
Multistage Steam Turbine and Reactive Steam Turbine
Shanghai AXD Heavy Machinery Co., Ltd.
Swipe or use the arrows to view product images.
Extraction Condensing Steam Turbine 5MW 10MW 15 MW 20 MW
| Price | $500000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 550 people viewed |
Model NO.:
RUNH
Power:
60MW
Generator Type:
DC Generator
Output Type:
DC
Certification:
ISO, CE
Standard:
Standard
Capacity:
12mw~60mw
Speed:
3000r/M; 5600r/M; 6500r/M
Inlet Steam Pressure:
3.43mpa~8.83mpa
Inlet Temperature:
435c~535c
Maximum Inlet Steam Quantity:
100tph~500tph
Cooling Type:
Air Cooling/ Water Cooling
First Stage Extraction Steam Pressure:
0.49mpa~3.92mpa
First Extraction Steam Qualtity:
35tph~150tph
Second Stage Extraction Steam Pressure:
0.196mpa~1.57mpa
Secondary Extraction Steam Qualtity:
40tph~150tph
Trademark:
RUNH
Transport Package:
Standard Packing
Specification:
1MW~60MW
Origin:
China
HS Code:
8402119000
Product Description
Characterstics:
1.Cogeneration steam turbine, working as a main mover in a thermal power station and having a wide range of application;
2. Covering various inlet conditions and extraction conditions ;
3. A special steam turbine applicable to make good use of one or more types of low level heat resource;
4. Respective adjustment of thermal loading and electric loading to meet customer's requirements thereupon;?
5. Run under extraction or pure condensing operating condition;
6. Rational construction, sensitive governing and smooth running;
7. Fuly hydraulic and DEH governing system;
8. Higher quality, national medal for quality.
Runh Power is an EPC contractor and complete equipment supplier, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 18 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:
1 Professional design institute:
We own independent design institute, about 50 experienced and Professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes.
2 Cost effective equipment:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipment for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.
3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoid potential delays in delivery.
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.
5. Second hand equipment
We own abundant second-hand equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipment such as Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipment.
1.Cogeneration steam turbine, working as a main mover in a thermal power station and having a wide range of application;
2. Covering various inlet conditions and extraction conditions ;
3. A special steam turbine applicable to make good use of one or more types of low level heat resource;
4. Respective adjustment of thermal loading and electric loading to meet customer's requirements thereupon;?
5. Run under extraction or pure condensing operating condition;
6. Rational construction, sensitive governing and smooth running;
7. Fuly hydraulic and DEH governing system;
8. Higher quality, national medal for quality.
Runh Power is an EPC contractor and complete equipment supplier, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 18 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:
1 Professional design institute:
We own independent design institute, about 50 experienced and Professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes.
2 Cost effective equipment:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipment for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.
3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoid potential delays in delivery.
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.
5. Second hand equipment
We own abundant second-hand equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipment such as Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipment.
- Similar Products
$3000000.00
1 Piece (MOQ)
Back-Extracted Steam Turbine
Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$100000.00
1 Piece (MOQ)
Back Pressure Steam Turbine for Power Generation (T530)
Zibo Renao Steam Turbine Co., Ltd.
$300000.00
1 Piece (MOQ)
Single Layer Back Pressure Steam Turbine Generator
Anhui Xinning Equipment Co., Ltd.