Swipe or use the arrows to view product images.
Fully Automatic Powder Coating Line for Door /Metal Painting
| Price | $100000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 324 people viewed |
Model NO.:
colo-USA-Line
Application:
Aerospace Industry, Appliance Industry, Automotive Industry, Construction Industry, Electronics Industry, Furniture Industry, Hardware Spraying Equipment
Coating Type:
Electrostatic Coating
Heating system:
Diesel, electric, gas, LPG
Warranty:
1 Year
Brand:
Colo
Equipment 3:
Powder Coating Machine
Equipment1:
Automatic Powder Coating Booth
Equipment2:
Powder Coating Oven
Dimension(L*W*H):
as Per Request
Operation:
Automatic
Heating up Time:
30 Mins
Type Kind:
Coating Production Line
Weight:
as Per Design
Type:
Electrostatic Spraying Equipment
Coating:
Powder
Certification:
CE, ISO
Condition:
New
After-Sales Service:
1 Year
Trademark:
colo
Transport Package:
Paper Carton or Wooden Packing
Specification:
CE
Origin:
Zhe Jiang
Product Description
Fully Automatic Powder Coating line For Door /Metal Painting
Production Process
(Customized according to customer requirements)
Powder spray coating: upper hanging→spraying (automatic, manual spraying)→baking curing (180-220ºC adjustable, 20min)→cooling→down hanging.
Procuction Process | Equipment | Temperature(ºC) | Time | Type |
Loading | / | RT | Adjustable | |
Pre- treatment | spraying system | 50-60 | 10 mins | Dip tank pretreatment Spraying pretreatment |
| Drying | drying oven | 120 degree | 10mins | |
Powder Coating | Reciprocator Automatic cyclone booth powder feed center | RT | 3-5 mins | Automatic robot spraying |
Curing | Bridge oven | 180-220 degree | 20 mins | Tunnel oven &Bridge oven |
Cooling | Automatic | RT | 10-15 mins | |
Unloading | Manual | RT | Adjustable |
Pre-treatment System
Pre-treatment spraying system
Pre-degreasing --- degreasing --- water washing 1 --- pure water washing 2 --- nano ceremic --- water washing 1 --- pure water
Pre-degreasing --- degreasing --- water washing 1 --- pure water washing 2 --- nano ceremic --- water washing 1 --- pure water
Drying oven
Drying oven
after pre-treatment , the metal need be drying .normally set temperature 120 degree ,Curing time 10 minutes. the oven power source can be electric or gas or diesel .oven sizes can be customized
after pre-treatment , the metal need be drying .normally set temperature 120 degree ,Curing time 10 minutes. the oven power source can be electric or gas or diesel .oven sizes can be customized
Automatic Powder Spray system
Automatic Powder Spray system including cyclone powder coating booth *1 set + powder coating reciprocator *2 set+automatic powder coating machine *16 set+Powder Feed Center *1 set
Item | Component | Position | Material/Specification |
| Basic Model | Booth Body 5 M * height 2M * width1 M | Lampstand | 304 stainless steel3.0 or PP material |
| 40*40*2.5 Square Pipe | |||
| Stand Plate Roof Plate | 10mm Thinkness | ||
| Rotary cylinder | |||
| Lamp | 18W | ||
| Pipe | Round Pipe | ||
| Mono Cyclone | Main Body | 304spherical surface stainless steel3.0 | |
| Second Recovery system | Main Body | Cold-rolled plate | |
| 18 Filter | φ325*600 mm | ||
| 9 Rotary Wings | 1200mm | ||
| Pulse solenoid valve | |||
| Air Mtor | 15kw | ||
| Control System | All eqiupment Integrated control | ||
Gas/Diesel/Electric Powder Coating Oven
Diesel Powder coating oven
Materail: 100mm rock wool panel for the oven temperature 180~220 Celsius
Heating exchange room + fan motor
In this USA automatic powder coating line, the oven size is L47m*W1.2m* H2.5m
Materail: 100mm rock wool panel for the oven temperature 180~220 Celsius
Heating exchange room + fan motor
In this USA automatic powder coating line, the oven size is L47m*W1.2m* H2.5m
Our projects:(we have Rich experience)
Many projects finished all over the world, including China, Europe (UK, Ireland, Switzerland, Bulgaria, Cyprus, Croatia); New Zealand, Middle East (Qatar, Kuwait, Saudi Arabia, Egypt, Iraq); Asia (Thailand, Philippines, Kyrgyzstan); Latin America (Mexico,Chile, Ecuador,Argentina); Africa (Morocco, Nigeria, Kenya), and so on.
We're not selling a machine, we're offering a solution. It is an important part of your business success.
Service assurance:
1. Provide complete information, including equipment drawing, electrical circuit control chart and use maintenance instruction.
2. Equipment troubleshooting method.
3. Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
4. After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days. 5. Any problems with the equipment, our company guarantees to give solutions within 12 hours.6. The warranty period of the equipment is 2 years.In 2 years, spare parts will be provided free of charge for any problems caused by non-human factors
2. Equipment troubleshooting method.
3. Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
4. After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days. 5. Any problems with the equipment, our company guarantees to give solutions within 12 hours.6. The warranty period of the equipment is 2 years.In 2 years, spare parts will be provided free of charge for any problems caused by non-human factors
Customer Visiting&Exhibition
We have went to many exhibitions durning our 11 years running .Also many customers visit our company ,check the goods and discuss to expand our business .
- Similar Products
$5000.00
1 Set (MOQ)
Oil/Electric/Gas Heat Exchanger for Coating Production Line
CHG International Limited