Swipe or use the arrows to view product images.
Genuine New Stock Chongqing Ccec Construction Machinery 450HP Motor Engine Assy Nta855-C450 Diesel Driven for Pump Used
| Price | $13555.00 |
|---|---|
| Min Order | 1 sets |
| Availability | In Stock |
| Shipping From | Hubei, China |
| Popularity | 379 people viewed |
After-sales Service:
Spare Parts Offered
Warranty:
1 Year
Ignition Mode:
Electric Ignition
Speed:
Speed
Cooling Cylinder:
Water-Cooled
Intake Pressure Impulse:
Supercharged
Piston Movement:
Rotary
Fuel:
Diesel
Number of Strokes:
Four-Stroke
Cylinder Arrangement Form:
L
Number of Cylinders:
6-Cylinder
Type:
Electric Motor
Product Name:
450HP Motor Engine Assy Nta855-C450
Model:
Nta855-C450
Rated Power/Speed:
450/2100
Emission Standard:
Euro3
Cold Style:
Water-Cooled
Gross Weight:
1644 Kg
Dimension(L*W*H):
1.67*1.16*1.5
Displacement:
14L
Video Outgoing-Inspection:
Provided
Start:
Electric Start
Place of Origin:
Hubei, China
Stroke:
4 Stroke
MOQ:
1set
Engine Type:
Diesel Engine
Application:
Construction Equipment
Trademark:
CCEC
Transport Package:
Wooden Case
Specification:
1.67*1.25*1.56m
Origin:
China
Product Description
Use | Construction engine |
Model number | NTA855-C450 |
Displacement | 14L |
Rated power/speed | 450HP/2100RPM |
Applicable industry | Machinery Repair Shops/ Retail/Construction works /Energy&Mining |
Country of origin | China |
Emission standard | China3/Euro3 |
Gross Weight | 1644kg |
Q1. When can I get the price?
A: We will reply you within 24 hours after we get your inquiry. Or you can directly call us if you are very urgent.
Q2. How long is the production time of the goods?
A: Our warehouse has sufficient regular sizes stocking, ready to delivery. And we have a lot of raw materials storage, customer specifications can be arranged in a timely manner production, delivery can be made within 7-15 days.
A: Our warehouse has sufficient regular sizes stocking, ready to delivery. And we have a lot of raw materials storage, customer specifications can be arranged in a timely manner production, delivery can be made within 7-15 days.
Q3. How to solve the problems of products in the using process?
A: We have a professional technical team, will be online to solve the use of the process encouraged various problems. If can't be solved online, technical staff will arranged timely home visits.
- Similar Products