Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Goldmoon 10% off DC 20V Max-Compatible-Li-ion Battery Brushless Electric Hand Power Drill Cordless Power Tool with Fast Charger

Price $29.90
Min Order 10 Sets
Availability In Stock
Shipping From Jiangsu, China
Popularity 364 people viewed
Model NO.:
E-87785
Type:
Cordless Drill
Classification:
Hand Drill
Drill Brand:
Goldmoon
Applications:
Building and Industrial
Impact Drill Structure:
Canines Style
Specification:
10mm
Impact Drill Head:
Adjustable Drill
Drill shape:
Round
Condition:
New
Customized:
Customized
Color:
Customization
Battery:
2PCS
Voltage:
21V
Direction of Rotation:
Forward Rotation/Reverse Rotation
Speed:
2000 Rpm
Trademark:
BeHappy
Transport Package:
Carton
Specification:
25*29cm
Origin:
China
HS Code:
8467210000
Product Description
10% off DC 20V Max-Compatible-Li-ion Battery Brushless Electric Hand Power Tools Cordless Power Drill with Fast Charger

Product Description

product namecordless impact drillmodel noBHP-PT-002
power typesrechargeablesupply voltage220V
battery voltage21Voutput power50W
impact rate0-2000/minspeed2000 RPM
drill chuck dia13mmbattery qty2 PCS
package wayplastic boxcolorcustomization
applicationfamily/industry
MOQ100 sets
 

usage scenario

Other Products

 

Service Evaluation


 

Company Profile


FAQ

 

FAQhttps://gmindustry.en.made-in-china.com/contact-info.html
Q: What can we provide ?
A: We are a professional manufacturer of hole saw and have our own packing centre. Through more than 10 years of effort, we have worked together with many good manufactuers of different tools as an exclusive tool club. We can provide our factory direct price for a vast range of products, including power tool accessories, hand tools, combination kits, etc.
Q:What is the shipping port?
A: We ship the goods via Shanghai port.
Q:How about the sample?
A: The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account
Q:How do you control the quality?
A: We will make samples before mass production, and mass production will be arranged after samples approved. Doing 100% inspection during production, then do random inspection before packing, taking pictures after packing.
 
Shipping way
1. Small quantity: by international air express, within 3-7days arriving
2. Large quantity: by ocean cargo, arriving time depends on customers destination
  • Similar Products
Full Page Contact Supplier