Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Good Quality Zq127 Drill Pipe Tubing Power Tongs for Drill Rig

Price $3000.00
Min Order 1 Piece
Availability In Stock
Shipping From Jiangsu, China
Popularity 509 people viewed
Model NO.:
ZQ127/25
After-sales Service:
on Line Support
Warranty:
1 Year
Certification:
ISO 9001:2000
Power Source:
Hydraulic
Applicable Medium:
Mud, Water, Natural Gas, Crude Oil
Structure:
Vertical
Material:
Stainless Steel
Range of Master Tong:
2 7/8"~5 1/2"
Rate Torque of High Gear:
3500n.M
Rated Troque of Low Gear:
25000n.M
Rated Speed of High Gear:
<=65 R/Min
Rated Speed of Low Speed:
<=10 R/Min
Max. Flow:
120L/Min
Dimension:
1050*780*1000mm
Weight:
650kg
Rated System Pressure:
16MPa
Transport Package:
Plywood Box
Specification:
XQ140
Origin:
Jiangsu China
HS Code:
8413910000
Product Description
The drill pipe hydraulic power tong is applied to oil field operation.  It can ensure operation satey and save labor of workers, improving the operation efficiency.  This power tong has the following features:

1. Using pneumatic power to shift and drive backup tong;
2. It is integral mechanism made by spin tong and torque tong;
3. Changing tong allowed during operation;
4. New or old pipe joint could be clamped reliably;
5. Both directions could run the maximum torque  and rotation speed.


    Related Petroleum Equipments

 




                           Main parameters for drill pipe hydraulic power tong 
ModelZQ127/25YZQ203/100ZQ203/125
Range of power tong2 7/8"~5 1/2"3 1/2"~8"3 1/2"~8"
Rated torque of high gear3500N.m9500N.m10000N.m
Rated troque of low gear25000N.m100000N.m125000N.m
Rated speed of high gear<=65 r/min40 r/min33r/min
Rated speed of low gear<=10 r/min2.7 r/min2.2 r/min
Rated system pressure16MPa16Mpa18Mpa
Maxiumum flow120L/min114L/min120L/min
Dimenison(mm)1250*780*10001700*1000*14001750*1060*1680
Weight(with backup tong)650kg2400kg2500kg


 


Q:How can I place order? 
A: You can contact us by email or social media like WhatsApp on the order detail or place order on line. 

Q:How about the payment?
A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection.


Q:How can I pay you?
A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the PI, you can make the payment through your bank as per the terms mentioned in PI.

Q: What's the order procedure? 
A: First we discuss order details, production details by email ,TM or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you. 

Q: How do you deal with  defective products received by the clients
A:  If there are some defective items, we usually credit to our customer or replace them in next shipment.





  • Similar Products
Full Page Contact Supplier