$1.00
1 Piece (MOQ)
Marine Forging Ring and Assortment Flanges
Jinan Jianghua Forging Machinery Co., Ltd.
Swipe or use the arrows to view product images.
Guaranteed Quality Unique Popular Product Large Size Flanges Steel Weight Round Flange
| Price | $120.76 |
|---|---|
| Min Order | 200 Pieces |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 381 people viewed |
Model NO.:
24
Standard:
ISO9001
Type:
Flange
Material:
Stainless Steel
Structure:
Round
Connection:
Flanged
Manufacturing Way:
Forging
Technics:
Forged Casting
Application:
Valves Spare Parts
Transport Package:
Customer Requriement
Specification:
Customize
Origin:
China
Product Description
Products Description
Product packaging
Q: Can I have a sample order for valve?
A: Yes,we welcome sample order to test and check quality.Mixed samples are acceptable.
Q:Could you print our company LOGO on the nameplate and package?
A:Yes,we can do that.
Q:Do you have any MOQ limit for valve order?
A:According to the product specification to set up the order.
Q:How do you ship the goods and how long does it take to arrive?
A:We usually ship by sea.It usually takes 30 days to arrive.Airline shipping Also optional.
Q:How to proceed an order for valve?
A:Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms The samples and places deposit for formal order.Fourthly We arrange the Production.
Q:How many days the productswill be ready?
A:Generally 3 to 4 weeks,depends on the quantity.
Details Images
Certifications
Company Profile
FAQ
A: Yes,we welcome sample order to test and check quality.Mixed samples are acceptable.
Q:Could you print our company LOGO on the nameplate and package?
A:Yes,we can do that.
Q:Do you have any MOQ limit for valve order?
A:According to the product specification to set up the order.
Q:How do you ship the goods and how long does it take to arrive?
A:We usually ship by sea.It usually takes 30 days to arrive.Airline shipping Also optional.
Q:How to proceed an order for valve?
A:Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms The samples and places deposit for formal order.Fourthly We arrange the Production.
Q:How many days the productswill be ready?
A:Generally 3 to 4 weeks,depends on the quantity.
- Similar Products
$253.00
10 Pieces (MOQ)
Stainless Steel Blind Flange Pn1.6MPa GOST 12836-67 F304/304L
Zhejiang Huiyu Flange Co., Ltd.
$6.00
100 Pieces (MOQ)
ASME B16.5 Class 150 304 316 A105 Blind Flange
Hebei Yshengze Pipeline Equipment Co., Ltd
$5.00
100 Pieces (MOQ)
Forged ANSI Class150 Steel Weld Neck Flange
Xianggong Flange Manufacturing Co., Ltd.