Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia

Price $28800.00
Min Order 1 Set
Availability In Stock
Shipping From Shandong, China
Popularity 472 people viewed
Model NO.:
HWL390H
After-sales Service:
Support
Warranty:
Support
Type:
Vibration Piling Machine
Pressure Pile Driver Type:
Hydraulic Pile Driver
Pile Hammer Type:
Drop Hammer
Motor Power:
55kw
Noise:
With Noise
Certification:
ISO 9001:2000
Condition:
New
Piling Speed(M/Min):
1-2m/Min
Min Ground Interspace:
380mm
Main Valve Flow:
100L/Min
Drilling Diameter:
130-800mm
Climb Angle:
35
Rated Speed:
2400r/Min
Max Drill Depth:
3600mm
Max Travel Speed:
5km/H
Rated Power:
55kw
Weight:
7200kg
Trademark:
HW
Transport Package:
Wooden Case
Specification:
CE
Origin:
Shangdong China
HS Code:
8430100000
Product Description
 
Product Description

Pile Driver

Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.
 
Oil province,is a common driver uses around half of a year can be a driver left money for you.
 
Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.
 
Crawler walking,high walking and climbing ability
 
The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.
 
Product Parameters

 

ModelHWL390H
Work quality7.41T
Rated power/Speed85KW/2600RPM
Max torque/Speed375N · M/1850RPM
Work pressure100Mpa
Drill pipe diameter100mm
Shipping size4500*2260*2970
Frame rotation angle360°
Traveling speed3km/h
 

Product Applications

HWL390H Photovoltaic piling machine is a high-performance piling equipment launched by Hengwang Group according to different sites.

In addition to piling the foundation of photovoltaic power stations, it can also be used in farms, pastures, forest farms, orchards and other construction scenarios.
Detailed Photos

 Main feature:

-Install a large number of support piles/pedestals in the shortest possible time.
 

-Initially, 30 piles could be installed per day, and today the production has increased to an average of 50 piles.
 

-Your installation costs are reduced by 40% compared to traditional installation methods. Save measurement costs and reduce personnel.


  • Similar Products
Full Page Contact Supplier