Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Heating and Cooling Dual-Purpose Central Air Conditioner Fancoil Wind Fan Coil Unit

Price $200.00
Min Order 1 sets
Availability In Stock
Shipping From Shandong, China
Popularity 278 people viewed
Model NO.:
FP-KM
Type:
Central Air Conditioners
Capacity:
24000-27000 BTU
Usage:
Room
Indoor Machine Noise:
24-35dB
Certification:
CE
China Energy Efficiency Standard:
Level 1
Cooling/Heating:
Cooling/Heating
Power Source:
Electrical
Power Type:
DC
Condition:
New
Air Vloume:
340-3500m3/H
Cooling Capacity:
1900-14000W
Heating Capacity:
3400-39000W
Voltage:
110/220V
Frequency:
50/60Hz
Product Name:
Vertical Concealed Fan Coil Unit
Application:
Offfice
Keyword:
Fcu
Noise:
Noise
Power:
Power
Air Volume:
340 M3/H-2380m3/H
Net Weight:
50kg
Material:
Galvanized
Brand:
Aike
Trademark:
aike
Transport Package:
Carton
Specification:
1260*580*130mm
Origin:
China
Product Description
Product Parameters

 

          
 
1.Are you factory or trade company?
We are manufacture,with OEM service.

2.Are there any order requirements?
We will appreciate it a lot if you can offer us your product performance requirements and operation environment, so that we can
customize optimal production to meet your every requirement.
(1) Air volume
(2) Cooling/heating capacity
(3) Cooling/heating area
(4) Power and voltage

3.What are your Before-sale services
(1) Tell customers how to use our products and matters needing attention.
(2) Guide customers to choose the best and economic product, recover the investment within short time.
(3) Site inspection if you need.

4.What are your In-Sale services
(1)Quality control must be inspected strictly.
(2)In accordance with the agreements stipulated in the contract.

5.What are your After-sale services?
(1) If the project needs our installation guidance, we can send our engineer and translator. We can also send customers
installation video to teach them how to fix and operate with our product.
(2) Usually, our product warranty is 18 months after leaving factory or 12 months after installation for non-human factor
damages,within this months, all parts broken will be responsible for our factory.
(3) Regular contact with customer, consult with the customer feedback, come true with the customer's two-way communication.

6.How long is the delivery time?
Generally it is 1-7 working days if the goods are in stock. or it is 15-25 working days if the goods are not in stock, it is
according to quantity.
  • Similar Products
Full Page Contact Supplier