Heavy Duty Rubber Track 200 Meter CE Mud Drilling and Air Drilling Machine for Water Wells
| Price | $18320.61 |
|---|---|
| Min Order | 1 sets |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 424 people viewed |
| Right elevation | Left elevation | Front elevation |
| Specification | Unit | CWD200 |
| Geology drilled | All kind | |
| Drilling Type | DTH&Mud Rotary | |
| Drill system and operation | Hydraulic | |
| Hole Diameter | mm | φ90-φ450 |
| Hole Depth | m | 200 |
| Rotation Torque | Nm | 4500-6500 |
| Rotation Speed | rpm | 0-90 |
| Drill pipe diameter | mm | 76/89/102/114 |
| Drill pipe length | mm | 3000 |
| Max. Feed Speed | M/min | 18 |
| Max. Lifting Speed | M/min | 5-12 |
| Feed Stroke | mm | 3400 |
| Max.Lifting Force | Ton | 14 |
| Lifting force of Main Winch(Optional) | T | 4 |
| Lifting force of Hoist | Kgs | 1500 |
| Lifting Height of Tool Winch | m | 6 |
| Engine | ||
| Diesel Engine type | YUCHAI | |
| Electrical System | Volt | 24 |
| Rated Horse power | Kw | 77 |
| Compressor required | ||
| Compressor type | Rotary Screw/Movable | |
| Pressure Required | Mpa | 1.5-2.5 |
| Air consumption | m³/min | 15-30 |
| Mud Pump(Optional) | ||
| Type | Hydraulic | |
| Model | BW450 | |
| Stroke | mm | 100 |
| Displacement | L/min | 450 |
| Discharge pressure(Mpa) | Mpa | 5 |
| Suction Tube Diameter | mm | 85 |
| Discharge Pipe Diameter | mm | 51 |
| Foam Pump | Optional | |
| Dimension | ||
| Net Weight | Kgs | 5400 |
| Transportation dimension | mm | 3950*1700*2150 |
| Ground Clearance | mm | 300 |
| | ||
| Famous Hydraulic Control Valve | YUCHAI 70KW Engine | High power hydraulic pump |
| | | |
| High Hydraulic Support Leg | Heavy Duty Rubber Crawler | 1.5Ton Hydraulic Tool Winch |
Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. | A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. | A: 365×24 Year-round Service | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |
TWD CWD200 Crawler Type Drilling Rig for Drilling 200m | TWD TWD TWD200 Trailer Type Drilling Rig for Drilling 200m | CSD300A Truck Type Drilling Rig for Drilling 300m |
- Similar Products