Negotiable
200 Pieces (MOQ)
All-Fuel Wood-Burning Residential Home Fireplace Chimney
Suzhou Rainbow Environmental Equipment Co., Ltd.
Swipe or use the arrows to view product images.
Helical Submereged Arc Welded Carbon Steel Pipe SSAW Welded Spiral Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
| Price | $1000.00 |
|---|---|
| Min Order | 5 Tons |
| Availability | In Stock |
| Shipping From | Shanghai, China |
| Popularity | 269 people viewed |
Model NO.:
SSAW pipe
Type:
Welded
Technique:
SAW
Material:
Carbon Steel
Surface Treatment:
Black
Usage:
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape:
Round
Od:
219-3220mm
Thickness:
4-25.4mm
Length:
Fixed Lentgh, as 12m - 80m Per to Requset
Ends:
Plain or Beveled
Trademark:
Chief Steel
Transport Package:
in Bulk
Specification:
CE, API, AS, JIS, EN
Origin:
China
HS Code:
73051900
Product Description
roduction description
Product application
spiral steel pipe can used for low-fluid transportation, oil and gas transportation, as well as used for steel pilings.
production process
Packing
Packing:
1.In bundle, black, caps, beveled ends or plain ends
2.OEM/ customer's REQUEST
3.Marks: Standard * Material*OD*WT*L *Lott No./required
Shipping:
a. Length: ≤5.85m, loaded in 20FT Container, Max 22tons
b. Length: ≤11.85m, loaded in 40 FT Container, Max 27tons
c. Length: ≥12m, shipped by bulk vessel. FILO terms
d. Delivery time :about 20-30 days after received deposit
Quality testing
FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.
| Product Name | API series ssaw steel pipe | |
| Size | OD: | 219-3220mm |
| Thickness: | 4-25.4mm | |
| Length: | fixed lentgh, as 12m - 80m per to requset | |
| Steel Material | GR.B-X80, S275JR/J0/K2H, S355J0H, S355J2H St52-0 etc. | |
| Standard | EN10219 / ASTM A 252 /ASTM A53 / API5L | |
| Usage | Used For Gas, Petroleum, Water ,Oil, Structure, Sewage and Piling pipe | |
| Ends | Plain or Beveled (Can be Protected By Plastic Pipe Cap) | |
| Surface | Bared Or Paint With Oil, Bitumen,1-3 layer PE, Juton coating, (Outside Or Inside Anti-Corrosion Treatment Can Supply) | |
| Inspection | With Hydraulic Testing, Eddy Current , Infrared or X-Ray Test Also With Chemical And Physical Property Inspect | |
| Technique | Submerged Arc welding, with cold formed | |
| Type | Welded | |
| Welded Line Type | Spiral | |
| Section Shape | Round | |
| Package | In Bulk, Or Other Method According To The Contract | |
| Date of Delivery | Less Than 15/20/25/30/40/50/60 Days According To The Quantity | |
| Port of Shipment | Main Port,China | |
| Others: | We also supply pipe fittings for example screws and flange Our products are high quality but low price. Wish you contact us. | |
Product application
spiral steel pipe can used for low-fluid transportation, oil and gas transportation, as well as used for steel pilings.
production process
Packing
Packing:
1.In bundle, black, caps, beveled ends or plain ends
2.OEM/ customer's REQUEST
3.Marks: Standard * Material*OD*WT*L *Lott No./required
Shipping:
a. Length: ≤5.85m, loaded in 20FT Container, Max 22tons
b. Length: ≤11.85m, loaded in 40 FT Container, Max 27tons
c. Length: ≥12m, shipped by bulk vessel. FILO terms
d. Delivery time :about 20-30 days after received deposit
Quality testing
FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.
- Similar Products
$890.00
10 Tons (MOQ)
API 5CT P110 Casing Tubing Seamless
TIANCHENG METAL MATERIAL(TIANJIN) CO., LTD.
$2000.00
1 Ton (MOQ)
Sdy Cold Drawn Hydraulic System Pipe
Zhangjiagang Shengdingyuan Pipe-Making Co., Ltd.
$650.00
25 Tons (MOQ)
Made in China Tianjin Red Painted Fire Hydrant Pipe
Tianjin Jinnuo Steel Pipe Co., Ltd.