Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

High-Quality Carbon Steel Forged Parts for Manufacturing Needs

Price $50.00
Min Order 100 Pieces
Availability In Stock
Shipping From Hebei, China
Popularity 359 people viewed
Model NO.:
L010
Processing Object:
Metal
Molding Style:
Forging
Molding Technics:
Hot Forging
Application:
Machinery Parts
Material:
Steel
Heat Treatment:
Tempering
Surface Treatment:
Sand Blasting
Forging Tolerance:
+/-0.5mm
Standard:
ASME
Size:
Customized
Other Material:
Steel Alloy, Carbon Steel, Ss, Brass, Aluminum
Type:
Forging Part
Inspection:
100% Test
Trademark:
Customize Available
Transport Package:
Wooden Case or According to Your Demand
Specification:
Customize Available
Origin:
China
HS Code:
7308900000
Product Description
Product Description

 

Product Name: Carbon Steel Hot Forging Parts

 

Category: Hot Forging

 

Keywords: Hot Forging, Steel Parts, Industrial Use, High-Quality, Forged, Parts, Steel, Hot, Quality, Industrial

 

Description: Elevate your industrial projects with our high-quality carbon steel hot forging parts. These forged steel parts are designed for industrial use, ensuring durability and reliability in demanding applications. Crafted with precision and expertise, our hot forging parts are guaranteed to meet the highest quality standards. Whether you need components for machinery, equipment, or other industrial purposes, our carbon steel parts are the ideal choice. Trust in the strength and performance of our hot forging parts to enhance the efficiency and effectiveness of your operations. Upgrade to our premium steel parts today and experience the difference in quality and durability.

 
Processes
Hot forging, Die forging
Material Available
Steel, Stainless Steel, Aluminum, Brass
 Weight range
0.5~25kgs
 
Detailed Photos
Packaging & Shipping

 

FAQ

 

1: What information does the quotation need?
Pls. offer your drawings and/or samples, quantity and packing's requirements.
2: What's lead time for samples and products?
Lead time for samples: 30-70days depend on the structure of the part and other requirements on heat treatment, machining, surface
treatment and so on.
Mass production lead time: 35-70days depend on products' characteristics and quantity.
3: What is the requirement on payment?
Tooling Cost:100% T/T advanced
Payment for the Order:30% deposit,70% to be paid before shipment.
4: What are surface treatments available?
Powder coating, Shoot Blasting, Painting, Polishing, Acid Pickling, Anodizing, Zinc Plating, Hot-dip Galvanizing, Electrophoresis,
Chrome Plating
5: What is the packing?
Normal buck packing suitable for shipment by sea and by air.
We also organize packing according to customers' requirements.
  • Similar Products
Full Page Contact Supplier