Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

High Quality Cheap Price Auto Spare Parts Brake Pad Metal Brake Backing Plate

Price $3.00
Min Order 100 Pieces
Availability In Stock
Shipping From Shandong, China
Popularity 278 people viewed
Model NO.:
BeiXin Machinery
After-sales Service:
as Per Customers' Requirements
Warranty:
3 Months
Type:
Cold Stamping
Processing Type:
Shaping Metal
Material:
Carbon Steel
Mould:
Simple Single Process Dies
Surface Processing:
Electroplating
Fine Blanking:
Multi-Position
Process:
Forming Process
Industry:
Auto Accessories
Tolerances:
0.1mm
Customized:
Customized
Item:
Backing Plate for Brake Pads
Service:
OEM/Customized Manufacturing
Shipping Method:
by Sea or by Air
Transport Port:
Qingdao, Shanghai, Tianjin
Certification of Origin:
Provide According to Customers' Ask
Delivery Date:
About One Month
Export Market:
All Over The World
Size:
Custom-Made
Packing:
Plywood or Carton Cases
Trademark:
BeiXin Machinery
Transport Package:
Plywood Cases or as Per Customers' Requirements
Specification:
Customized
Origin:
Weifang, Shandong Province
HS Code:
8708301000
Product Description

 High quality cheap price auto spare parts brake pad metal brake backing plate

 
Detailed Photos

 

 
Product Description
 
Product Name:brake pad back plate 
Material:Q235B super steel
Different Types:Pressed, Casted, With Mesh and Spot Welding
Flatness:0.25mm
Burnish Zone:Above 95%
MOQ:100 pcs
Package:plastic bag,carton,pallet
Sample charge:Free
Sampling time:About 3-7 days depending on the models and quantities.
Delivery time:In about 25-35 days after the customers confirm the order
Payment:T/T 30% PRE,and 70% before delivery;L/C at sight;West Union etc
Port:Qingdao/Shanghai
Production Process:cutting plate -blanking - punching hole - punching pin -fine cutting -chamfer -leveling -shot blasting
-packing
Equipment:blanking machine,punching machine(250t,125t,80t,60t) ,shot blasting machine
 
Our Advantages

1. Flexibility:small orders are acceptable for quick delivery;
2. High quality due to first-hand control in factory;
3. Competitive price directly from in housing plant;
4. Quick Response and quickly action within in 8 hours.



Production Process:
1. Mold (Tooling) design and Manufacture.
2. Manufacture the parts according to the Stamping Machine.
3. Riveting, Welding or Screw tap according to Customer's require.
4. After finish manufacture process we will test the parts by the Image measurement instrument, Caliper, Angel 
Gage etc.

5. After make sure all the dimension can reach customer's require, we will make the surface treatment process.
6. After finish surface treatment we will testing all the parts by worker so that we can make sure the parts which we sell is 100% qualified.
7. After finish testing we will pack the parts by Vacuum Package Machine. 



Application:


Quality Inspection:

>> Receiving inspection to raw material

All materials must be provided with suppliers' certificates, and have to pass the receiving inspection before starting production. Occasionally, material samples will be sent to independent lab for specific test to meet customers' demands. All materials have to be tagged and classified, so the original source could be traced at any time during production processes.

>> Producing inspection

Every phase of production processes will be monitored by producing inspection. The first product shall accept test in every phase of production process. Only it completes the test and confirmed by quality control manager, mass production could be operated. Every producing operator will implement constant tests during production processes, including size-measuring, observing the appearance. 


 
Packaging & Shipping

Carton/Plywood Cases by Sear or Air or According to Customers' Requirements

FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DAP.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.



Quality and Service are Our Company's Foundation!
We Sincerely Welcome Any of Your Inquiry, Please Click the Below "Send" to Contact with Us Freely!


  • Similar Products
Full Page Contact Supplier