Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Ductile Iron Casting Services for Heavy Equipment

Price $1500.00
Min Order 1 Ton
Availability In Stock
Shipping From Henan, China
Popularity 246 people viewed
Model NO.:
ductile cast iron
Type:
Clay Wet Sand
Casting Method:
Thermal Gravity Casting
Sand Core Type:
Clay Sand Core
Application:
Electronic Accessories
Machining:
Machining Center
Material:
Iron
Surface Treatment:
Sand Blast
Surface Roughness:
Ra6.3
Standard:
GB
Weight:
1kg~100kg
Packing:
Carton Box
Video Outgoing-Inspection:
Provided
MOQ:
1 PC
Delivery:
7-10 Days Depending on Qty
Trademark:
jing yan
Transport Package:
FIBC
Specification:
1KG~100KG
Origin:
Yu Zhou
Product Description
Product Description

Sand Core TypeClay Sand Core
MachiningMachining Center
Surface TreatmentSand Blast
StandardGB
Transport PackageFIBC
Trademarkjing yan
Production Capacity2000ton/Year
Yuzhou Jingyan Machinery Co., Ltd, is a renowned leader in mechanical processing, boasting a remarkable journey from a mere casting production entity to a cutting-edge deep processing powerhouse. Through strategic investments in state-of-the-art equipment and an optimized industrial structure, they have honed the unparalleled ability to swiftly develop innovative new products and molds. Discover the key highlights of this outstanding company:
1. Geographical Location: Ideally situated in the vibrant Yazhuang Industrial Zone, with prime access to the S325 provincial highway, ensuring excellent logistical convenience and connectivity.
1. How can I get the quotation?
To receive a comprehensive quote, kindly provide us with the following detailed information: drawing, material, weight, quantity, and any specific requests you may have.

2. If we don't have a drawing, can you make a drawing for me?
Absolutely! We can meticulously create a precise drawing from your sample and seamlessly replicate it to perfection.

3. When can I get the sample?
Sample Delivery: Expect your sample within 15-20 days after mold creation commences. The exact timeline will be tailored to your specific product requirements.

4. What is your main order time?
Order Fulfillment Time: Standard fulfillment is 20-25 days post-payment. However, the precise timeline is customized to fit your unique product specifications.
  • Similar Products
Full Page Contact Supplier