Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

High-Quality Durable Ductile Iron Parts with Outgoing Inspection Videos

Price $1500.00
Min Order 1 Ton
Availability In Stock
Shipping From Henan, China
Popularity 236 people viewed
Model NO.:
ductile cast iron
Type:
Clay Wet Sand
Casting Method:
Thermal Gravity Casting
Sand Core Type:
Clay Sand Core
Application:
Electronic Accessories
Machining:
Machining Center
Material:
Iron
Surface Treatment:
Sand Blast
Surface Roughness:
Ra6.3
Standard:
GB
Weight:
1kg~100kg
Packing:
Carton Box
Video Outgoing-Inspection:
Provided
MOQ:
1 PC
Delivery:
7-10 Days Depending on Qty
Trademark:
jing yan
Transport Package:
FIBC
Specification:
1KG~100KG
Origin:
Yu Zhou
Product Description
Sand Core TypeClay Sand Core
MachiningMachining Center
Surface TreatmentSand Blast
StandardGB
Transport PackageFIBC
Trademarkjing yan
Production Capacity2000ton/Year


Yuzhou Jingyan Machinery Co., Ltd. shines brightly as a symbol of excellence within the mechanical processing industry. Transitioning seamlessly from a traditional casting production company to a forward-thinking deep processing leader, they have strategically embraced cutting-edge technology, ensuring their industrial structure is optimally designed. This transformation enhances their capabilities in swiftly developing new products and crafting molds. Discover the key highlights of this remarkable company:
1. Geographical Location: Strategically positioned in the Yazhuang Industrial Zone, right next to the S325 provincial highway, offering unmatched logistical advantages.


1. How can I obtain a quotation?
To receive a comprehensive quote, please provide us with detailed information, including your drawing, material specifications, weight, quantity, and any specific requirements you may have.

2. If we lack a drawing, can you create one for us?
Absolutely! We are fully capable of creating an accurate drawing from your sample and replicating it with precision.

3. When can I expect to receive the sample?
Anticipate receiving your sample within 15-20 days after initiating mold creation. Exact timing may vary based on your product's specifics.

4. What is the typical lead time for orders?
Typically, orders are completed within 20-25 days post-payment. However, timelines may adjust according to your specific product needs.
  • Similar Products
Full Page Contact Supplier