Swipe or use the arrows to view product images.
High Quality Wheel 1.25m2 Rotating Digger Excavator Bucket
| Price | $1000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Fujian, China |
| Popularity | 360 people viewed |
Warranty:
180 Day
Type:
Crawler Excavator
Usage:
Special Excavator, Mining Excavator, GM Excavator
Transmission:
Hydraulic Transmission
Drive Type:
Internal Combustion Drive
Bucket Capacity:
0.1~0.5m³
Size:
Small-Scale
Certification:
ISO9001: 2015
Condition:
New
Material:
Q355b
Bucket Size:
Support Customization
Transport Package:
Bubble Film
HS Code:
843149
Product Description
Excavator Bucket
(1)Product:
(2)Working Dimension:
| Excavator tonnage | T | 20-25t | 30-36T | 40-47T | ||||||
| Total length | mm | 15200 | 18000 | 18000 | 20000 | 22000 | 20000 | 22000 | 24000 | |
| Max digging radius | mm | 15000 | 17300 | 17300 | 19200 | 21000 | 19200 | 21000 | 23000 | |
| Max cut depth | mm | 10300 | 12500 | 12600 | 14500 | 16000 | 14500 | 16000 | 17000 | |
| Max cut depth vertically | mm | 9500 | 11600 | 11700 | 13600 | 15200 | 13600 | 15200 | 16200 | |
| Max cut height | mm | 12600 | 15300 | 15300 | 17300 | 18500 | 16200 | 17500 | 18750 | |
| Max unloading height | mm | 10300 | 13000 | 13000 | 15000 | 16000 | 14000 | 15000 | 16000 | |
| Min rotate radius | mm | 4750 | 5100 | 5100 | 6200 | 6200 | 6200 | 7750 | 7750 | |
| Boom length | mm | 9100 | 10500 | 10500 | 11500 | 12500 | 11500 | 12500 | 13350 | |
| Stick length | mm | 6100 | 7500 | 7500 | 8500 | 9500 | 8500 | 9500 | 10650 | |
| Stick max cut force(ISO) | KN | 83 | 65 | 118 | 95 | 80 | 170 | 139 | 109 | |
| Bucket max cut force(ISO) | KN | 150 | 99 | 153 | 153 | 153 | 153 | 153 | 153 | |
| Bucket capacity | m3 | 0.5 | 0.4 | 1.2 | 0.7 | 0.5 | 1 | 0.8 | 0.7 | |
| Bucket rotate degree | deg | 170 | 170 | 170 | 170 | 170 | 170 | 170 | 170 | |
| Folding length | mm | 13000 | 14500 | 15000 | 16000 | 17000 | 16000 | 17000 | 18000 | |
| Folding heigtht | mm | 3050 | 3100 | 3300 | 3350 | 3400 | 3450 | 3480 | 3500 | |
| Extra Counter weight | T | 1 | 3.5 | 4 | 5 | 6 | 5 | 6 | 8 | |
(3)Features:
1.Material - )The material used in the excavator long arm is Q355B
- )If other steel is required, please contact us, Q690D customized service
Use a plasma cutter to ensure part flatness
3.Internal view
Spaced by vertical and horizontal reinforcement plate at regular interval
Welding
A.) Welded with mixed gas between argon and carbon dioxide. Argon content:80%.Carbon dioxide content:20%.
B.) Welded by auto-welding machine .
Sandblasting
A.) The surface of the workpiece can obtain a certain degree of cleanliness and different roughness, so that the mechanical properties of the workpiece surface are improved, thus improving the fatigue resistance of the workpiece, increasing the adhesion between it and the coating, and prolonging the coating film. Durability, also good for paint leveling and decoration.
5.Product packaging and Shipping
6.Company Services
1, Long reach boom are use for dredging rivers port construction, railway construction and groundwork construction, with high extensive operation scope, high efficiency and high security.
2, Our company was founded in 2008 with more than 10 years of experience, production line engineers have more than 10 years of data and experience for all brands of excavators designed and customized long range booms.
3, Applicable for all the excavator model,OEM service is also available.
4, Advanced manufacturing process, Technique is in the line with global standards.
5, We have all the installation dimensions of most excavator, we can customize this long reach boom for your excavator.
6, Before welding, we have use big edge milling machine mill(taper process) the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance. Also the inside have strength plate make it more stronger.
7, If necessary, extra pipeline can be added to suit to some extra application.
8, Stick cylinder of the long boom, can use your original stick cylinder to save the cost, if you need the stick cylinder, we also can prepare for you.
9, Some parts can be consolidated using thicker plate or overlapping another plate for heavy-duty application.
10, Welding is protective-gas welding, the protective gas is 80% Argon and 20% CO2 mixed. This is golden standard for protective gas.
11, Before welding, we have use big edge milling machine mill the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance.
12 .We can customize the arm for all kinds of excavator as per your request. Just let me know your request.
13. If you need, some parts can be consolidated using thicker plate or overlapping another plate for heavy-duty application, just let me know.
14. Not make the bucket for this extender arm as customer request. But if you need us prepare the bucket for you, that's ok.
| MODEL | LDB120 | LDB200-1 | LDB200-2 | LDB300 | LDB350-1 | LDB350-2 | LDB450 |
| boom length(mm) | 7100 | 8220 | 10000 | 10000 | 11000 | 12000 | 13000 |
| arm length ( mm) | 5900 | 7160 | 8000 | 8000 | 9000 | 10000 | 11000 |
| Weight(kg) | 3000 | 4000 | 4200 | 5200 | 6000 | 6500 | 7000 |
| Max dig depth(mm) | 9000 | 11340 | 12200 | 12200 | 14500 | 16100 | 18000 |
| Max. extensive scope(mm) | 12500 | 15100 | 17600 | 17600 | 19600 | 21600 | 23600 |
| Max. dig height(mm) | 11300 | 12510 | 13500 | 13720 | 14920 | 16100 | 17300 |
| folding height(mm) | 2900 | 2980 | 3040 | 3210 | 3210 | 3400 | 3400 |
| bucket capacity(m3) | 0.3 | 0.5 | 0.4 | 0.4 | 0.5 | 0.6 | 0.6 |
| Suit Excavator tonnage(ton) | 12 | 20 | 20 | 30 | 35 | 35 | 45 |
- Similar Products
$4000.00
1 Piece (MOQ)
Cheap Good Working Condition 1ton Digger Mini Excavator Price
Shandong Hightop Group
$5170.00
1 Piece (MOQ)
Cheap Mini Escavatore 1.7 Ton Small Excavator
Jining SAAO Machinery Manufacturing Co., Ltd.