Swipe or use the arrows to view product images.
Hnarl Aerial Work Platform Parts Aftermarket Genie Z450c 82279gt Gn-82279 Control Panel Decal
| Price | $23.50 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Hunan, China |
| Popularity | 271 people viewed |
Model NO.:
82279GT
After-sales Service:
Yes
Warranty:
1 Year
Type:
Control Panel Decal
Application:
Genie Lifts
Certification:
CE
Condition:
New
Part Type:
Control Panel Decal
Compatible Equipment Type:
Genie Lifts
Compatible Equipment Make:
Genie
Part Number:
82279gt
Application1:
Used for Genie Lifts
Quality Level:
High Performance
Stock:
Enough
Weight:
0.50 Kg
Trademark:
HNARL
Transport Package:
Standard Export Packing
Specification:
68X22X0.10 cm
Origin:
China
Product Description
HNARL Aerial Work Platform Parts Aftermarket
Genie Z450C 82279GT GN-82279 Control Panel Decal
DECAL, PLATFORM CONTROL | |
Part number: | 82279GT GN-82279 |
Used for: | Z-45/25, Z-45/25J, Bi-ENERGY |
Serial Number Range from SN Z452505-27000 to Z452507-34010 Z-45/25 Z-45/25J from SN Z452507A-34011 to Z4516A-55298 DC & Bi-Energy from SN Z452512B-2245 to Z452516B-5452 from SN Z452513D-101 to Z452516D-939 | |
Packing Specifications: | |
Length (mm) | 680 |
Width (mm) | 220 |
Height (mm) | 1 |
Weight (kg) | 0.5 |
With the advantage of global resourcing and one-stop purchasing
10,000+ kinds of parts for your choose, and 200,000+ stock on warehouse
If you look for one reliable supplier to get a wide range of spare parts
If you need professional help
If you want more competitive pricing and superior quality
Feel free to contact Aerial-Power team.
10,000+ kinds of parts for your choose, and 200,000+ stock on warehouse
If you look for one reliable supplier to get a wide range of spare parts
If you need professional help
If you want more competitive pricing and superior quality
Feel free to contact Aerial-Power team.
Product Delivery | Shipping Time | Start & End | Descriptions |
By Express. DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect | 3-8 working days | Door to Door | For Small order, Sample order, Trial order Fast & Convenient |
Air Transportation By Plane | 5-10 working days | Door to Airport | For Medium order Fast & Cheaper than express The consignee needs to take delivery at the airport |
Sea Transportation By Vessel | 20-45 days | Door to Seaport | For Mass order Cheap but take time The consignee needs to take delivery at the seaport |
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.
- Similar Products
$800.00
2 Pieces (MOQ)
Main Control Valve for Mini Excavator 3.5 Ton
Qingdao LKC Hydraulic Machinery Co., Ltd.
$950.00
2 pieces (MOQ)
312D Swing Motor 169-5569 170-9893 169-5549
Guangzhou Otto Excavator Parts Co., Ltd.
$33600.00
1 Piece (MOQ)
Powerful Jaw Bucket Jaw Crusher Bucket
Anhui Motek Construction Machinery Co., Ltd.