Swipe or use the arrows to view product images.
Hot DIP Galvanized 400kv Y-Frame Steel Tower Power Distribution Transmission Tower
| Price | $1100.00 |
|---|---|
| Min Order | 10 tons |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 516 people viewed |
Model NO.:
Transmission line tower
Usage:
Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower
Conductor Circuit:
Multi Circuit
Certification:
ISO, CE
Materials:
Steel
Standard:
Standard
Style:
Cable Tower
Structure:
Y Type
Product Name:
Transmission Line Tower
Voltage:
10kv to 750kv
Type:
Angular Towers, Tubular Towers, Guyed Mast
Surface:
Hot DIP Galvanized
Galvanization Standard:
ASTM a 123
Single Package Size:
10X20X20cm
Application:
Electric Power Transmission and Distribution
Warranty Period:
50 Years
Painting:
White, Black or as Client′s Requirement
Fabrication Standard:
Gbt 2694-2010 or ASTM Standard
Steel Grade:
Hot Roll Steel Q235, Q345, Q420, Q460, ASTM A527
Thickness of Steel:
2~30mm
Shape of Steel:
Tapered / Round/ Octagonal
Our Services:
Professional Customization Services
Trademark:
Jiudingli
Transport Package:
Export Standard Package
Specification:
AS PER CLIENT REQUIRED
Origin:
Shandong, China
HS Code:
7308200000
Product Description
Hot DIP Galvanized 400kv Y-Frame Steel Tower Power Distribution Transmission Tower
Transmission line tower is a tower-like structure used for power transmission. Their structural characteristics are that all kinds of tower types are space truss structure, the rod is mainly composed of a single equilateral Angle steel or combination Angle steel, the material is generally used Q235 (A3F) and Q345 (16Mn) two kinds, the connection between the rod is made of coarse bolts, by the bolt shear connection, the whole tower is composed of Angle steel, connecting steel plates and bolts. Individual parts, such as the tower foot, are welded into a composite by several steel plates, so it is very convenient for hot-dip galvanizing anticorrosion, transportation and construction. For the tower with a height below 60m, foot nails are set on one of the main materials of the tower to facilitate the construction personnel to climb the tower.
Product name | Transmission line tower |
Surface | Hot Dipped Galvanzied |
Certificate | CE/ISO9001 |
Advantages | Customized Service Provided |
Service life | 50YRS |
Engineering Service | Engineering |
Our Service | Professional Customization Services |
A transmission line tower is a tower-likestructure used for power transmission. Theirstructural characteristics are that all kinds oftower types are space truss structures, and therods are mainly composed of single equilateral Angle steel or combined Angle steel, and thematerials are generally Q235 and Q345
Features:
1. Various towers are space frame structure. Bars are composed of single equilateral angle steel or combination of angle steel.
2. The materials are generally Q235, Q345 and Q420. The connection between the bars is crude bolt.
3. Hot dip galvanized anti-corrosion. Very convenient for transportation and construction erection.
4. We set foot nails on one of main legs to facilitate the construction workers to climb onto the tower for operation.
2. The materials are generally Q235, Q345 and Q420. The connection between the bars is crude bolt.
3. Hot dip galvanized anti-corrosion. Very convenient for transportation and construction erection.
4. We set foot nails on one of main legs to facilitate the construction workers to climb onto the tower for operation.
Q: How to pay?
A: T/T - 30% deposit in advance, 70% balance before shipment. Or L/C At sight.
A: T/T - 30% deposit in advance, 70% balance before shipment. Or L/C At sight.
Q: What is the delivery time?
A: Generally speaking, the delivery time will be within 15 - 35 days.
Q: How about your quality control?
A:We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.
Q: How to install?
A:We will provide detailed instruction photos and videos to you.If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help installation.However, the visa fee,air tickets,accommodation, wages will be borne by buyers.
A: Generally speaking, the delivery time will be within 15 - 35 days.
Q: How about your quality control?
A:We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.
Q: How to install?
A:We will provide detailed instruction photos and videos to you.If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help installation.However, the visa fee,air tickets,accommodation, wages will be borne by buyers.
- Similar Products