Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Hot-DIP Galvanized Scaffold Jack for Building Construction (KTP-4)

Price $5.50
Min Order 1 Piece
Availability In Stock
Shipping From Hebei, China
Popularity 287 people viewed
Model NO.:
KTP-4
Connection Type:
Clamp Connection
Finish:
Galvanized
Material:
Steel
Type:
Building Scaffold
Color:
Primary Colour
Trait:
Q235 Steel
Surface Treatment:
Hot DIP Galvanizing
Advantages:
Rust and Corrosion Resistance
Diameter:
48mm
Thread Length:
300mm-400mm
Length:
600mm-1000mm
Base Plate Size:
120mm*120mm-150mm*150mm
Transport Package:
Steel Pallet, or as Your Request
Origin:
Cangzhou China
HS Code:
7308400000
Product Description
Product Description


Hot-dip galvanized scaffold Jack for Building construction (KTP-4)

Our U Head Jack and Base Jack are integral components in the scaffolding system, designed to ensure stability and proper leveling.
The U Head Jack serves a crucial function of leveling the scaffold - standards at the exact same height.  This precision leveling is essential for the overall safety and functionality of the scaffolding structure.  By allowing for fine - tuning of the vertical height, it enables workers to create a flat and secure working platform.
The Base Jack, on the other hand, acts as the fundamental base for scaffolding bays.  When used in conjunction with all kinds of shoring posts and shoring scaffolding systems, both the Head/Base Jack play the vital role of top and bottom support.  They bear the weight of the entire scaffolding structure and the loads placed upon it during construction, maintenance, or other industrial operations.

All our Head and Base Jacks are manufactured with the highest quality standards in mind.  We select the best raw materials and follow certified quality assurance processes across the entire supply and production chains.  The production is carried out by our skilled professionals in strict compliance with recognized international standards such as BS:EN39, BS:EN74, EN12811, ANSI/SSFI SC100 - 5/05, and AS/NZS 1576.  This ensures that our products are not only reliable but also meet the safety requirements demanded by various industrial applications.  Whether it's a small - scale residential project or a large - scale construction job, our U Head Jack and Base Jack are up to the task, providing the necessary support and stability for your scaffolding needs.

Detailed Photos

 

Product Parameters
ModelmaterialcolorsizeSurface treatmentweight(kg)
KTP-4Q235 steelPrimary colourDiameter: 48mm (suitable for disc scaffold system)
- ** Length **:
- 600mm
- 700mm
- 800mm
- 900mm
- 1000mm
Thread length: usually 300mm-400mm, the specific length can be adjusted according to demand.
- ** Base plate size **: usually 120mm x 120mm or 150mm x 150mm, the thickness is generally 5mm to 6mm.
hot dip galvanizing, enhance rust and corrosion resistance. 
solidQ235 steelPrimary colour28*400 
solidQ235 steelPrimary colour28*4501.8kg
solidQ235 steelPrimary colour30*400 
solidQ235 steelgalvanize30*4502.2kg
hollowQ235 steelgalvanize 38*5003.4kg
hollow Q235 steelgalvanize38*6004.8kg
KTSQ235 steelgalvanize** Diameter **:
- 28mm
- 30mm
- 32mm
- 34mm
- 36mm
- 38mm
- ** Length **:
- 500mm
- 600mm
- 700mm
- 800mm
- 900mm
- 1000mm
- ** Thread length **: usually 300mm-400mm, the specific length can be adjusted according to demand.
- ** Base plate size **: usually 120mm x 120mm or 150mm x 150mm, the thickness is generally 5mm to 6mm.
cold galvanized or spray treatment to enhance rust and corrosion resistance 
Company Profile

Packaging & Shipping
FAQ

 Q1 Are you a factory or a trading company?
A: We are a factory specializing in the production of various scaffolding materials.

Q2 What is the minimum order quantity for this product?
A: There are different MOQ for different products. The usual minimum order is 1000

Q3 Can I take some samples?
A: Yes, the sample is free, but usually the customer will pay for the shipping.

Q4 Do you have OEM service?
Yes. We can provide OEM and ODM services according to your requirements.

Q5 How long is the production cycle after order?
A: Usually 15 days.

Q6 What is the payment method?
A: 30% prepayment or negotiation subject to order.
  • Similar Products
Full Page Contact Supplier