Swipe or use the arrows to view product images.
Hot Internal Scaffolding Steel China System Prop Systems Shoring Props Formwork
| Price | $120.00 |
|---|---|
| Min Order | 500 Square Meters |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 494 people viewed |
Model NO.:
Green Formwork
After-sales Service:
Quality Warranty
Warranty:
Quality Warranty
Material:
Steel
Type:
Fixed
Structural Style:
Tower Scaffolding
Framework:
Frame Combined Scaffolding
Supporting Mode:
Projecting Scaffolding
Lapping Form:
High Formwork
Erection Position:
Internal Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Props
Construction Properties:
Building Scaffold
Material.:
Steel, Aluminium, Plywood
Surface:
Hot Dipped Galvanized, Powder Coated
Brand:
QS
Place of Orgin:
China
Trademark:
QS
Transport Package:
Metal Pallets
Specification:
2m/3.6m, 1.75m/3m, 2.2m/4m
Origin:
China
HS Code:
73084000
Product Description
Green Formwork ,with technology from Canada,with drop head mechanism,is the BEST slab formwork systems in the world in recent 15 years.
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
Qingdao Scaffolding I&E Co., Ltd. and Qingdao Formwork International Co.,Ltd. are one of the biggest manufacturer in whole China for Scaffolding systems and Formwork Systems.
All our products are made as per European standard, American standard and Australian standard.
For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world:especially in whole Europe, Australia, New Zealand, U.S.A., Canada , South American countries and Southeast Asia countries.
We have opened 5 branch companies in Germany( Round GMBH),Australia (Round Scaffolding Pty Ltd.), Sweden(RILLCO),USA(Round Formwork and Scaffolding Inc),Cambodia(Round Formwork and Scaffoldings Co.,Ltd), and 5 foreign offices: In France(QingDao Scaffolding Co.,Ltd),Brazil(QingDao Scaffolding Group ),Burma(QingDao Scaffolding Group),Indonesia(QingDao Scaffolding Group),Vietnam(QingDao Scaffolding Group).
Green Formwork:
Panel - Prop early stripping Green Formwork System - Aluminium Formwork / Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
| Item | Item | specification | unit weight |
| Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
| MB189 | 1.8X0.9M | 37 | |
| MB186 | 1.8X0.6M | 29 | |
| MB1512 | 1.5X1.2M | 39.4 | |
| MB159 | 1.5X0.9M | 31.3 | |
| MB156 | 1.5X0.6M | 23.8 | |
| MB1212 | 1.2X1.2M | 32 | |
| MB129 | 1.2X0.9M | 26 | |
| MB126 | 1.2X0.6M | 21 | |
| MB99 | 0.9X0.9M | 21 | |
| MB96 | 0.9X0.6M | 17 | |
| MB66 | 0.6X0.6M | 12.3 |
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.
- Similar Products
$10.00
1500 Pieces (MOQ)
Adjustable Telescopic Steel Struts for Enhanced Load-Bearing Capacity
Tangshan Wufang Industry Co., Ltd.
$6.00
1000 Pieces (MOQ)
Drop Forged Doka Type Formwork Lock Panel Clamp
Rizhao Weiye Tools Co., Ltd.
$25.00
200 Pieces (MOQ)
Pre Galvanized Steel Formwork Frame Scaffolding
Tianjin Bridge Steel Co., Ltd.