Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Hot Sale 7kw AC EV Charger Electric Vehicle Power Supply

Price $659.00
Min Order 1 Piece
Availability In Stock
Shipping From Hunan, China
Popularity 436 people viewed
Model NO.:
ANSI-ACL007A
Number of Charging Interfaces:
One Pile with One Charge
Location:
Public Use
Installation:
Floor Type
Charge Method:
Normal Charge
Model Number:
ANSI-Acl007A
Product Name:
7kw AC Charging Station
Certificate:
CE RoHS ISO
Ocpp:
1.6j
IP Grade:
IP 54
Input Voltage:
AC240V ±15%
Output Voltage:
AC240V ±15%
Charging Standards:
AC Type 1/2 /GB/T
Cable Length:
4 Meters
Communication:
3G/4G/Ethernet
Display Screen:
4.3 Inches
Application:
Commercial
Rated Current:
32A
Rated Output Power:
7 Kw
After-Sales Service:
2 Years Warranty
Trademark:
Future Digital Energy
Transport Package:
Wooden Case Packing
Specification:
size: L340*W201*H1500(mm)
Origin:
Shenzhen
HS Code:
8504409999
Product Description
Product performance description

1.Support RFID / OCPP 1.6J 

2. 4.3 Inches Color Touch Screen 

3.Support multiple modes of charging, operation management and payment

4.Support Type-2 / Type-1/ GB/T connector (or Socket) optional 

5.Two Years Warranty
 
They are suitable for occasions such as city special charging stations that provide charging for bus, taxi, public service vehicles, sanitation vehicles,logistics vehicles,etc.; city public charging stations that provide charging for private cars, commuter,bus; intercity highway charging stations and other occasions that need special AC fast charging.
 

Our Advantages

Packaging & Shipping

Why choose us?

FAQ

Q1. What is your term of packing?
A: Generally, we pack our goods in neutral brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your term of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your term of delivery?
A: FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 7 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
 
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
   2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
  • Similar Products
Full Page Contact Supplier