Negotiable
100 Pieces (MOQ)
200 Mesh Metallic Substrate Catalyst for Car
Jiangsu Yuquan Import & Export Co., Ltd.
Swipe or use the arrows to view product images.
Hot Sale Spinning Meet Euro OBD Emission Standard Universal Catalytic Converter
| Price | $12.00 |
|---|---|
| Min Order | 10 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 511 people viewed |
Model NO.:
All
After-sales Service:
1 Year Online Communication Service
Warranty:
1 Year
Type:
Catalytic Converter
Body Material:
Steel
Discharge Standard:
Euro III
Noise Source:
The Noise of Engine
The Noise of Engine:
The Combustion Noise
Automobile Chassis Noise:
Transmission Noise
Component:
Catalytic Converter
Main Market:
North America
Inside Core Material:
Ceramic Substrate/Metal
Trademark:
YueYang
Transport Package:
Carton Box
Specification:
23*11*11 2.8kg
Origin:
China
Product Description
1.Can be provided in standard or custom configuration.
2.Automatic robot cutting and welding, precise installation position
3.Good function of anti-poisoned and aging
4.Catalyic converter long service life
5.Good performance against high temperature
6.Purification efficiency is high reduces emission of CO, HC and NO2 by up to 98%
7.Inside converter, metal or ceramic honeycombed substrate
8.Substrate is rich in precious metals
9.With heat shield that protect the lower parts of vehicle from high temperature
FAQ
Q1.Are you a direct manufacturer or a trading company?
We are a manufacturer to produce exhaust system parts, owning both factory. And we also have our own international trade department,producing and sell ourselves.
Q2. Can you produce according to the samples?
Yes, All products could be customized complying with your samples or drawings. We can build the molds and fixtures.
Q3. What is your sample policy?
We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q4. How about your delivery time?
Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. What is your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q6. how can we guarantee quality?
Always a pre-production sample before mass production;Always final Inspection before shipment;
We are a manufacturer to produce exhaust system parts, owning both factory. And we also have our own international trade department,producing and sell ourselves.
Q2. Can you produce according to the samples?
Yes, All products could be customized complying with your samples or drawings. We can build the molds and fixtures.
Q3. What is your sample policy?
We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q4. How about your delivery time?
Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. What is your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q6. how can we guarantee quality?
Always a pre-production sample before mass production;Always final Inspection before shipment;
- Similar Products
Negotiable
20 Pieces (MOQ)
Diesel Particulate Filter DPF Cleaning DPF Filter
Pingxiang Dingwang Ceramics Co., Ltd.