Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Hot Selling New Model Silvery Compressor Cooling Hot and Cold Top Loading Water Dispenser Home Appliance Office Commercial Use

Price $50.00
Min Order 100 acres
Availability In Stock
Shipping From Zhejiang, China
Popularity 383 people viewed
Model NO.:
AFK-1416
Application:
Hotel, Outdoor, Commercial, Household
Type:
Hot & Cold
Installation:
Stand
Housing Material:
Plastic
Certification:
CE CB
Warranty:
1 Year
Keywords:
Hot Cold Warm Water Dispenser
Power Source:
Electric
APP-Controlled:
No
Power (W):
550
After-Sales Service Provided:
Free Spare Parts
Color:
Silvery
Cooling Method:
Compressor Cooling
Voltage (V):
220
Material:
ABS Material
Load Type:
Top Load
Function:
Hot Water Cold Water
Cooling Capacity:
2.0L/H 5-10
Dimensions (L x W x H (Inches):
330X340X980mm
OEM:
Accept
Trademark:
AOFUK
Transport Package:
Standard Export Carton
Origin:
Zhejiang, China
HS Code:
8516791000
Product Description
Products Description
Model No.
AFK-1416
Cooling system
Compressor cooling 
Color
silvery&black
Heating power
550W
Cooling power
90W
 Heating Capacity :
85-95   5.0L/h
 Cooling Capacity :
5-10  2.0L/h 
Packaging Dimension :
330*340*980mm
N.W/G.W
12/13KGS
Packing
Carton box with foam
Loading Qty.
618PCS/40'HQ
OEM
Accept
Materials :
All The Plastic Parts Are Made Of Anti-Bacteria ABS and Toughened glass Lateral Plate(Metal ) Is Cool Rolled Steel
Stainless Steel Welding Cold Tank with Copper Tube Ring
 
Rated Voltage/Frequency: AC220-240V;50/60Hz
Power Cord(Plug): Europe Type or Other Standard
Three configurations : Warm and hot /electronic Cooling/compressor cooling
 
 
Other products
WALL MOUNTED PIPELINE VERTICAL WATER DISPENSER RO WATER DISPENSER

 

DESKTOP WATER DISPENSER TEA BAR MACHINE WATER PURIFIER
FAQ
Q1: What is the production time?
A1: 25-30 days after deposit received.

Q2: Can I put my own Logo on machine?
A2: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.

Q3: What's your payment term?
A3: We usually accpet T/T as the main payment term,and other payments can also be negotiated.

Q4: What's the delivery time ?
A4: It's OEM ,so usually takes about 7-15 working days to produce the products.
 
Q5:What about the lead time for mass production ?
A5 : Honestly ,it depends on the order quantity and your specific requirements of products.
 
 
 
  • Similar Products
Full Page Contact Supplier