Swipe or use the arrows to view product images.
Hsk Series Photovoltaic Muffle Furnace
| Price | $200000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Anhui, China |
| Popularity | 392 people viewed |
Model NO.:
HSK3505-0711Z
Certification:
ISO9001
Protection:
Shock Resistance
Installation:
Vertical
Housing:
Steel
Belt Width:
150~350mm
Trademark:
Hengli
Transport Package:
Standard Exported Package
Specification:
L6905mm/272" x W1200mm/47" x H1530mm/60"
Origin:
China
HS Code:
8514300090
Product Description
For processing of Dye Sensitized Solar Cells, this sintering belt furnace allows the titanium dioxide nanocrystals to melt partially together in order to ensure electrical contact and mechanical adhesion on the glass. FEC (fully enclosed coil) heaters are located on the top and bottom of the process chamber. The furnace is integrated with clean stainless steel muffle and nitrogen atmosphere distribution system.
Advantages: Fast thermal response; Uniform and stable temperature control; Energy efficient; Perfect for Dye Sensitized Solar Cell processing.SpecificationHSK3505-0711
Furnace can be produced (procedure 90~135days) right away after pre-payment confirmation. COSCO Maersk MSC ship to worldwide for safe shipping, don't worry about package damage or loss. It takes about 15-40 days to worldwide, Please note us your contact details include your phone number for easy contacting from shipping company officer.
Advantages: Fast thermal response; Uniform and stable temperature control; Energy efficient; Perfect for Dye Sensitized Solar Cell processing.SpecificationHSK3505-0711
| Max Temperature | 1050 deg. c |
| Operation Temperature | 200-900 deg. c |
| Belt Width | 350mm/14" |
| Heating Length | 3220mm/127" |
| Control Zones | 7 |
| SpeedRange | 40-200mm(2" -8" )/min (other speed range as required) |
| Tunnel Height | 50mm/2" |
Furnace can be produced (procedure 90~135days) right away after pre-payment confirmation. COSCO Maersk MSC ship to worldwide for safe shipping, don't worry about package damage or loss. It takes about 15-40 days to worldwide, Please note us your contact details include your phone number for easy contacting from shipping company officer.
| By Sea | Delivery from Shanghai seaport |
| By Air | Departure from Shanghai Pudong Airport |
| By Express | Post by DHL, EMS, UPS, TNT, FedEx. |
Payment Terms | T/T | EXW | 50% T/T in advance, the rest balance paid before shipment |
| FOB | |||
| CFR | |||
| CIF | |||
| L/C | L/C amount above 200,000 USD, we can accept L/C at sight | ||
- Similar Products
Negotiable
1 Piece (MOQ)
Voltage DIP Compensator with 1kVA China Online LCD Rack UPS
Shenzhen Great Energy Technology Co., Ltd.