Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Huiding Custom Industrial Hardware Fasteners Stainless Steel Hook Loop Toggle Latch Electric Cabinet Draw Latch

Price $0.69
Min Order 100 Pieces
Availability In Stock
Shipping From Shandong, China
Popularity 296 people viewed
Model NO.:
DK084
Material:
SS304, Ss201, Steel
Usage:
Over Center Draw Latch
Structure:
Over Center Latch
Condition:
New
Brand:
Huiding
Surface Treatment:
Polished, Zinc-Plated
Application:
Industrial
ODM/OEM:
Accept
Type:
Customized
Weight:
74
Trademark:
HUIDING
Transport Package:
Carton
Specification:
32*22*15cm
Origin:
Shandong
HS Code:
8302300000
Product Description
Product Description

Model number: DK084


Material: Stainless steel 304
Surface treatment: Polished
Management Certification: ISO9001:2015
Origin: Shandong China
OEM orders: accept
Samples: for free
Product Parameters

 

ItemMaterialSurfaceWeight Packing/Carton
DK084G1 steel/ss201/ss304/ss316Nickel-plated,zinc-plated,polished46g600pieces
DK084Q1steel/ss201/ss304/ss316Nickel-plated,zinc-plated,polished55g600pieces
DK084Q2steel/ss201/ss304/ss316Nickel-plated,zinc-plated,polished60g600pieces
 
DK084T1steel/ss201/ss304/ss316Nickel-plated,zinc-plated,polished55g600pieces
 
Applications

Widely used in many fields. Like ships, high-speed rail, automobiles, civil products, and so on.

Detailed Photos

 

Certifications

 


Packaging & Shipping

Packing: packing can be made according to your request.

Single package size: 32mm*22mm*15mm

Company Profile

 

FAQ

Q: Are you a factory or trading company?


A: We are a professional manufacturer. We are warmly welcome clients from worldwide to

visit our factory and cooperate with us.

Q: What's your advantage? Why we choose you?

A: Great production capacity Sustainable Supply.According to customer requirements

we support the customized include package. We have the most professional

technology and team.  

Q: What are your production standards?

A: European standard stamping

Q: How long does the whole procedure being worked out?

A: The lead time is about 30days and it depends if the material is especial.


  • Similar Products
Full Page Contact Supplier