Swipe or use the arrows to view product images.
L Tray High-Quality Anti-Slip Acrylic Shower Tray Formodern Bathrooms
| Price | $68.10 |
|---|---|
| Min Order | 20 Pieces |
| Availability | In Stock |
| Shipping From | Guangdong, China |
| Popularity | 405 people viewed |
Model NO.:
L tray
After-sales Service:
Five Years Guarantee
Warranty:
Five Years Guarantee
Customized:
Customized
Color:
Single Color
Skirt Structure:
No
Size:
800*800*130mm
Base Material:
Acrylic
Base Shape:
Rectangle
Water Absorption:
0.3%-0.4%
Usage:
Bathroom Shower Base
Density:
1.15-1.19g/Cm³
Height Options:
130/160mm
MOQ:
20 PCS
Colors:
White
Style:
Morden
Samples:
Yes
Lead Time:
About 25days After Deposit
Delivery Time:
About 25days
Trademark:
Gerbath
Transport Package:
Carton Packing
Specification:
800*800*130mm
Origin:
China
HS Code:
3920510000
Product Description
| Name | Custom Acrylic Tray |
| Brand | Gerbath |
| Model | L tray |
| Material | Acrylic |
| Colour | White |
| Other type | Tray shape also can choose |
| Shape | Rectangle, Square, Diamond shape |
| Size/mm | Custmoer-made in available Width: 800*800*130/160mm |
| Packing Way | Kraft Carton |
| Appliances | Hotel, Apartment, Villa ,Real Estate, Modular House, Hospitals , etc. |
| Features | 1. Acrylic Tray is durable and has little water absorption |
| 2.High hardness, good impact resistance,not easy to break and anti-slip surface | |
| 3.No effect on the Floor surface | |
| 4.Protect shower screen glass, glass does not directly contact the ground | |
| 5.Used with shower room,Shower room accessories | |
| Shipping Port | Foshan port, Guangzhou port, Shenzhen port or others |
| MOQ | 20 PCS |
| Quality Control | Checked one by one |
| Delivery Time | about 25days |
| Lead Time | about 25days after deposit |
| Packing: |
| Export carton with sack /foam inside and can be OEM for buyer. |
| Packaging Details: Supper export package |
| 1)5 layers corrugated board carton with marks printed. |
| 2)Glass packed in PVC bag |
| 3)Carton bound with 4-6 plastic belts |
| 4)Stainless steel protected with foam film |
| 5)Accessories are separately packed into a white box |
| Delivery Time: |
| 1) 15-25days for trail order and sample after recieved the payments. |
| 2) 25-35 days for 20'GP after recieved the deposite. |
| 3) 35-50 days for 40'HQ/45'HQ after recieved the deposite. |
| Payment terms: |
| T/T 50% are paid before production, 50% balance will pay before loaded. |
| FAQ: |
| Q1: Are you a manufacturer or trading company? |
| A: We're the manufacturer of shower enclosures . |
| Q2: What's your payment term? |
| A: 50% T/T in advance, 50% balance pay before loaded. |
| Q3: What's the delivery time? |
| A: Normally is 15-35 days after deposit depending on your order quantity. |
| Q4:May I visit your factory? |
| A:Welcome ! Once you have decided to visit our factory, let me know your schedule and we will be waiting for you at the station or at the airport. |
| Q5:What about packaging? |
| A: |
| 1. First wrap the glass and aluminum with a film, |
| 2. Fill the upper middle and lower parts with foam and bubble film. |
| 3. Hardware parts are packed in cartons, |
| 4. Finally, wrap it in a cardboard box and fix it. |
| Q6:How about the sample? |
| A: We can supply the sample if we have ready parts in stock , but the customer you have to pay the sample cost and the courier cost. |
| Q7:How can I make sure the product you provide is what I want? |
| A: |
| 1) Contact us to check the specification, detail pictures, latest price etc. |
| 2) Order samples and install in your site to check the function and quality. |
- Similar Products