Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Large Component Ductile Iron Casting Services for Mining Applications

Price $1500.00
Min Order 1 Ton
Availability In Stock
Shipping From Henan, China
Popularity 294 people viewed
Model NO.:
ductile cast iron
Type:
Clay Wet Sand
Casting Method:
Thermal Gravity Casting
Sand Core Type:
Clay Sand Core
Application:
Electronic Accessories
Machining:
Machining Center
Material:
Iron
Surface Treatment:
Sand Blast
Surface Roughness:
Ra6.3
Standard:
GB
Weight:
1kg~100kg
Packing:
Carton Box
Video Outgoing-Inspection:
Provided
MOQ:
1 PC
Delivery:
7-10 Days Depending on Qty
Trademark:
jing yan
Transport Package:
FIBC
Specification:
1KG~100KG
Origin:
Yu Zhou
Product Description
Product Description

Sand Core TypeClay Sand Core
MachiningMachining Center
Surface TreatmentSand Blast
StandardGB
Transport PackageFIBC
Trademarkjing yan
Production Capacity2000ton/Year
Yuzhou Jingyan Machinery Co., Ltd stands as a beacon of success in the mechanical processing industry. Through strategic investments in cutting-edge equipment and a reimagined industrial structure, the company has made a remarkable transition from a casting production entity to a sophisticated deep processing powerhouse. Not only do they excel in swift new product development, but their advanced mold development capabilities are also noteworthy. Below are some of the key highlights that define the company's excellence:
1. Geographical Location: Ideally situated in the Yazhuang Industrial Zone, it benefits from proximity to the S325 provincial highway, offering exceptional logistical convenience.
1. How can I procure a quotation?
To obtain a detailed quote, kindly provide the following information: your design drawing, chosen material, estimated weight, desired quantity, and any specific requirements.

2. If there is no drawing available, can you create one for me?
Absolutely, we can create a precise drawing based on your sample and replicate the sample with exact accuracy.

3. When will I receive the sample?
Sample Delivery: Expect delivery 15-20 days post mold initiation. The precise timeline is contingent upon your specific product requirements.

4. What is your standard order lead time?
Order Fulfillment Time: Typically, 20-25 days following payment completion. As always, the exact timeline will be tailored to your product's specifications.
  • Similar Products
Full Page Contact Supplier