$60.00
50 Tons (MOQ)
Galvanized Metal Steel Scaffolding Plank
Huabei Yiande Scaffolding Manufacture Co., Ltd.
Swipe or use the arrows to view product images.
Layher Allround HDG Ledger Ringlock Scaffolding/Scaffold for All Kinds External Construction
| Price | $20.00 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 421 people viewed |
Model NO.:
LG01
Material:
Steel
Type:
Fixed
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Floor Type Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
External Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Props
Construction Properties:
Building Scaffold
Surface Treatment:
Hot DIP Galvanized/Pre-Galvanized
OEM/ODM:
Available
Validity:
More Than 20 Years
Thickness:
2.75mm/3.2mm
Delivery:
About 20-30 Days After Deposit
Factory Certificate:
ISO9001:2015
Certificate:
Ce SGS
Application:
Building/Tunnel/Bridge Construction
Raw Material:
Steel Q355b,Q235B,Q195
Color:
Silver Red Blue Grey
Connect Method:
Wedge Lock/Ring Lock
Way of Quoting:
by Piece or by Weight
Sample:
Available
Business Type:
Manufacturer and Exporter
Loading Port:
Tianjin or Qingdao
Trademark:
HDRL
Transport Package:
Steel Rack
Specification:
300mm 600mm 900mm 1200mm 1500mm 1800mm 2100mm
Origin:
China
HS Code:
73084000
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.
Q5: Can I get some samples?
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
Q8: What is the payment methods?
A: T/T or L/C.
- Similar Products
$55.00
1000 Pieces (MOQ)
Multi Purpose Scaffolding System for Building Tall Buildings
Cangzhou Zhite Building Materials Co., LTD
Negotiable
100 Pieces (MOQ)
Aluminium Scaffolding Step Stair for Multi-Using in Light Weight
Changzhou Yueyang Machinery Co., Ltd.