$12.00
200 Pieces (MOQ)
Scaffolding Prop Jack Puntal Andamio Construction Material
Sichuan Taishenglan Technology Co., Ltd
Swipe or use the arrows to view product images.
Layher Allround System Scaffolding of Ringlock Scaffold Building Construction Material Wholesale
| Price | $20.00 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 482 people viewed |
Model NO.:
ST102
Material:
Steel
Type:
Fixed
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Floor Type Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
External Scaffolding
Move Method:
Installed and Fixed
Scaffolding Part Type:
Ringlock Scaffolding System
Construction Properties:
Building Scaffold
Surface Treatment:
Hot DIP Galvanized/Pre-Galvanized
OEM/ODM:
Available
Validity:
More Than 20 Years
Thickness:
2.75mm/3.2mm
Delivery:
About 20-30 Days After Deposit
Factory Certificate:
ISO9001 ISO4001 ISO45001
Certificate:
Ce SGS
Application:
Building/Tunnel/Bridge Construction
Raw Material:
Steel Q355b, Q235B, Q195
Color:
Silver Red Blue Grey
Connect Method:
Wedge Lock/Ring Lock
Way of Quoting:
by Piece or by Weight
Sample:
Available
Business Type:
Manufacturer and Exporter
Loading Port:
Tianjin or Qingdao
Trademark:
HDRL
Transport Package:
Steel Rack
Specification:
500mm 1000mm 1500mm 2000mm 2500mm 3000mm
Origin:
China
HS Code:
73084000
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS certification.
Q5: Can I get some samples?
A: Yes, but usually the customer will pay for the cost and freight charges.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
- Similar Products
$30.00
1000 Pieces (MOQ)
Walk Through Metal H Steel Shoring Ladder Narrow Frame Scaffolding
Hebei Pangda Scaffold Co., Ltd.