Swipe or use the arrows to view product images.
Lianggongshifting Trolley Table Slab Formwork for Concrete Construction
| Price | $8.00 |
|---|---|
| Min Order | 1000 Meters |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 335 people viewed |
Model NO.:
Table Formwork
After-sales Service:
Yes
Warranty:
1year
Certification:
ISO
Material:
Spruce+Steel
Type:
Slab Formwork
Color:
Yellow
Model No:
Timber Beam
Bending Resistant:
5kN/M
Certificatite:
ISO9001
Trademark:
LIANGGONG
Transport Package:
Standard Packing
Specification:
Customized
Origin:
China
HS Code:
4418600090
Product Description
Table Formwork
Table Formwork is a kind of formwork that used for floor pouring ,used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion , table formwork sets can be lifted by lifting fork to an upper level and reused , without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure , easy disassembly ,and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks,steel pipes and timber planks. The construction speeds up obviously , and manpower has been saved greatly.
Standard unit of table formwork
Table formwork standard unit has two sizes:2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:
For untypical floor casting,the non-standard table formwork can be designed according to the need.The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.
Edge and middle filler
Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:
Lifting fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:
Lifting fork operation chart
Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:
Lifting fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:
Lifting fork operation chart
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
If you have another question, please feel free to contact us !
- Similar Products
$101.00
500 Square Meters (MOQ)
Timber Beam Slab Panel Zulin Concrete Peri Formwork Stably Table Form in China
Beijing Zulin Formwork & Scaffolding Co., Ltd
$1050.00
1 Ton (MOQ)
Custom Steel Column Molds for Bridge Construction
Beijing Aoyu template Co., Ltd.
$12.00
200 pieces (MOQ)
Factory Supply Plastic Column Formwork ABS Plastic Mould for Pillar
MTM BUILDING MATERIALS CO., LTD.
$25.00
200 Pieces (MOQ)
Plastic Round Column Formwork for Concrete Slab
Cangzhou Guangsu E-COMMERCE Co., Ltd.
$100.00
1 Square Meter (MOQ)
Aluminum Panel Formwork Mould for House and High Bulidings Construction
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
$100.00
1 Square Meter (MOQ)
Light Weight Aluminum Formwork for High Rise Buildings by 6061-T6 Hot Sale
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.