Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Lightweight Steel Struts for Easy Installation and Transport

Price $3.50
Min Order 500 Pieces
Availability In Stock
Shipping From Hebei, China
Popularity 309 people viewed
After-sales Service:
Guide Assembly Online
Warranty:
1 Years
Certification:
ISO, CE
Material:
Steel
Type:
Beam Formwork
Raw Material:
Steel
Base Board:
148*232*5mm
Angle Steel:
30*30*195*3mm
Tube:
31.6*2.0*140mm
Surface Finish:
Powder Coated, Galvanized
Trademark:
WUFANG
Transport Package:
by Buddle or in Pallet
Specification:
or as request
Origin:
China
HS Code:
73084000
Product Description

Product Description









Packaging & Shipping


 

Company Profile

Tangshan Wufang Industry Co., Ltd, with an investment of  130 million RMB, is a professional manufacturer engaged in the design, production & sale of scaffolding systems.

1. Location: Tangshan Wufang is leading scaffolding manufacturer, located in Tangshan, Hebei Province, the raw material basement.
2. Team: We have professional team for sale, project design and construction.
3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, H20 Beam, Aluminium Beam, etc.
4. Production capacity: 7000-10000 Tons/month.
5. Loading capacity: 8-12 containers/day.
6. Delivery time: 10-15 days for 3-5 containers.
Fast delivery to satisfy your urgent project demand.

FAQ

Q1: Are you a factory or trading company?   
A: We are a factory specializing in manufacturing scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.
Q5: Can I get some samples?   
A: Yes,  but usually the customer will pay for the cost and freight charges. 
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.

  • Similar Products
Full Page Contact Supplier