Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Low Power Consumption Min Pelletizer Machine

Price $6800.00
Min Order 1 set
Availability In Stock
Shipping From Zhejiang, China
Popularity 230 people viewed
Model NO.:
70/90
After-sales Service:
Whole Life
Warranty:
2 Years
Raw Material:
PE
Screw:
Single-Screw
Inverter:
Inverter
Electromagnetic Heater:
Electromagnetic Heater
Automation:
Automatic
Computerized:
Computerized
Customized:
Customized
Certification:
CE, ISO9001:2008
Condition:
New
Screw Material:
38crmoaia Nitrogen Treatment
L:D:
9:1
Driving Speed:
Frequency Adjustment
Extrusion Die:
Round Cutter
Cooling:
Fan Cooling
Cutter Optional:
Blade Replaceable
Trademark:
PASO
Transport Package:
Film Wrapping Wooden Case
Specification:
70
Origin:
China
HS Code:
8477201000
Product Description
Product Description

1.1 This machine is applicable to HDPE, LLDPE, LDPE, PAL waste films:edge film waste, air bubble film, pe stretch film recycling
1.2. Filter without screen and pelletize with rotary blade.
1.3 Production process: low-temperature type. (The screw does not need to be heated, and the first area of the pelleting head is heated by 1kw)
1.4 Water free and smokeless environment-friendly granulator Bubble film waste recycling granulator
Advantages:
Low power consumption, around 8-10kw per hour, no need water, no smoke, no smell, 
Easy operation by one worker or during other jobs.

Detailed Photos


Product Parameters

model70 /90
capacity20-50KG/H
power3Phase/380V/50HZ (customized available)
Hoppersize:300mm*300mm
GearModel:146#  
Hardness teeth
ScrewExtruder diamter:75mm L/D:1::9
Material:38CR;  Original Zhoushan
Drive Motor:15KW   4grade
CutterPower: 0.75kw, Inverter: 0.75kw 
ElectricityCHNT 
Control systemDie heater:1zone; 1kw
Heater cooling  1.1kw
coolingFan power 0.75kw 
Trade Terms
 

1.Packaging: wooden pallet or film wrapped (Fumigation wooden case usually)
2.Delivery time: 5-35/55 days after receiving deposit, depends on order and machine condition.
3.Exporting seaport: Ningbo port ; Shanghai port
4.Payment: we appreciate T/T 30% deposit, 70% balance paid before dispatching; Western Union;L/C acceptable if your goverment policy required
5.Trade terms: ExW,FOB,CFR,CIF,Door to Door, DDU, DDP

Packaging & Shipping

FAQ

1.Where is your factory Located
Our Factory Located in Ruian City ,Zhejiang Province ,China .
It is about 30minutes by air from Shanghai,  around 5hours by train from Shanghai

2.What machines range we make & supply?
Our factory focus on manufacturing extrusion lines, complete bag production line, etc; OEM, ODM, with support of strong R&D team, we also help customer get best solutions for special equipments and plastic machinery;  

3.How can we get satisfied machine in hand?
We will make test once machine in ready, to check every parts working condition and electrocircuit;  will record relative photo and video for installation in your place.

3. What should we charge if we need engineer service in our country?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary (negotiable)

4. How long is your machine's warranty period?
All our machine have two years guarantee, starting from finished installation. we still keep service for whole life.

5. How could we do if the parts broken within warranty?
We would send the free replacement spare parts during the warranty date.

  • Similar Products
Full Page Contact Supplier