Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

MFDC 55kVA Spot and Projection Inverter Welding

Price Negotiable
Min Order 1 Piece
Availability In Stock
Shipping From Guangdong, China
Popularity 301 people viewed
Model NO.:
DB-55-AA100
Cooling Way:
Water Cooling
Control:
Manual
Style:
Vertical
Welding Way:
Spot Welding
Type:
Ntermediate Frequency Inverter Welder
Rated Capacity:
55kVA
Power Supply:
380V/3phase/50Hz
Primary Current:
45A
Rated Duty Cycle:
35%
Secondary Empty Voltage:
8.9V
Throat Depth:
172mm
Max Working Pressure:
2510 N/0.5MPa
Max Short Current:
18000A
Cooling Water Comsumption:
6 L/Min
Dimension(L*W*H):
770*697.2*1467.5mm
Trademark:
HERON
Transport Package:
Wooden Case
Specification:
CE
Origin:
Guangzhou, China
HS Code:
8515219900
Product Description
55KVA Inverter Welding Equipment with Platform
 


Parameter
ItemParameter
Rated Capacity55KVA
Power Supply380V/3phase/50Hz
Primary Current45A
Rated Duty Cycle35%
Secondary Empty Voltage8.9V
Throat Depth172mm
Max Working Pressure2510 N/0.5MPa
Max Short Current18000A
Cooling water comsumption6 L/MIN
Dimension(L*W*H)770*697.2*1467.5mm


Company Introduction
Heron own over 56,000 square meters property; developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; single phase AC welding system; offer a complete range of standard resistance welding equipments; and customize automation resistance welding production system with fixture; pursue high welding technology researching and developing all the time.
 
Our productions apply to different field like: car body production line, automotive part production line, refrigerator compressor welding line, silver tip with copper welding system, hardware welding; home appliance manufacturer line etc ,supplying the high tech and energy saving welding equipment and integrate the working station.
 





FAQ
1.What's the trade terms?
A: FOB, EX-Work, CRF

2.What's the payment term?
A: a. T/T 30% as deposit, 70% should be paid before delivery.
   b. L/C at sight

3. What's the delivery time?
A: 2-3 months after received 30% deposit.

4. What's the package way?
A: Wooden case

5. Which shipment port?
A: Guangzhou or Huangpu

6.How long is the guarantee?
A: For one year after customer received the machine. (It's not including the comsumables)



 
  • Similar Products
Full Page Contact Supplier