$5000000.00
1 Set (MOQ)
Lead Frame Tank Chain Selective Silver Plating Machine
Dongguan Allmerit Technology Co., Ltd.
Swipe or use the arrows to view product images.
Manually Electroplating Nickel Chrome Mini Plating Equipment Copper Plating Plant
| Price | $28500.00 |
|---|---|
| Min Order | 1 set |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 352 people viewed |
Model NO.:
TD-M
After-sales Service:
Yes
Voltage:
380V
Automatic Grade:
Manual
Warranty:
1 Year
Application:
Surface Treatment
Plating Style of Electroplating Line:
Hang Plating
Material of Tank:
15mm PP Plate
Auxiliary Equipment:
Chiller,Rectifier,Heating System
Trademark:
Tongda
Transport Package:
Usually to Ba Packed in Plywood Box
Specification:
Non-standard
Origin:
China
Product Description
Manually Electroplating Nickel Chrome Mini Plating
Equipment Copper Plating Plant
Equipment Copper Plating Plant
Mannually electroplating line
| Automatic Type | Manually type |
| Tanks material | 15mm PP Plate/PVC |
| Plating Type | Hang plaing |
| Control System | Manual lifted up and down |
| machine frame | Steel body with anti-corrosion and resistant Epoxy painting . |
| Accessories | PP Tank , PP barrel , hanger , rectifier and etc. |
| External Device | Tumbling Machine ,Vibrating Polishing machine , Ultrasonic Cleaner, Drying Machine, Oven, rectifier, Filter, Water Chiller and etc. |
Welcome customized :
He electroplating line is non-standard , it is designed according to your products information .
The metal hangers for Rack /hang plating line , it is customized according to customers' products
Our services
Anti-leakage testing :
We will fill the tanks with water after welding and before installation , the testing time last 72 hours .
Runing testing :
We will installed the equipment and operate it . Meantime , we will take the testing videos to the customer to confirm it .
Auxiliary equipment:
Shipping:
The packing list is attached for the customer to check
We will fill the tanks with water after welding and before installation , the testing time last 72 hours .
Runing testing :
We will installed the equipment and operate it . Meantime , we will take the testing videos to the customer to confirm it .
The packing list is attached for the customer to check
Package mode : by plywood or shipping by container directly .
Shipping :Ocean shipping
Lead time : 20-30 working days
- Similar Products
$20000.00
1 Piece (MOQ)
Galvanizing Machine Electroplating Handicraft Processing Chiller
Foshan Chuangdingcheng Company
Negotiable
1 Piece (MOQ)
Plating Tank, Barrel, Flight Bar
Guangde Ruifu environmental Technology Co., Ltd