$56.69
100 Square Meters (MOQ)
Concrete Building Formwork Can Be Cut at Will 5cm Thick 30cm Wide
Hebei Leige Technology Development Co., Ltd.
Swipe or use the arrows to view product images.
Manufacture Concrete Reusable Precast Bridge Box Girder Beam Steel Formwork
| Price | $1600.00 |
|---|---|
| Min Order | 120 Tons |
| Availability | In Stock |
| Shipping From | Hunan, China |
| Popularity | 257 people viewed |
Model NO.:
Precast Bridge Box Girder Formwork
After-sales Service:
Online Technical Support
Warranty:
1 Year
Certification:
ISO, ISO 9001/ISO 14001/ISO 45001
Material:
Steel
Type:
Precast Box Girder Formwork
Surface Treatment:
Blast Spray Paint
Size:
Customized
Application:
Bridge or Highway
MOQ:
150 Tons
Project Solution Capability:
Graphic Design, 3D Model Design, Other
Sales Unit:
Ton
Colour:
Red/Blue/Customized
Design Style:
Contemporary
Delivery Time:
Days
Package:
Standard Package
Packing Type:
Standard Package
Trademark:
WuXin
Transport Package:
Standard Package
Specification:
Customized
Origin:
China
HS Code:
8474802000
Product Description
Bridge Box Girder Steel Mold Formwork
ADVANCED TECHNOLOGIES
•Rapid removal and replacement of the formwork with various beam lengths;
•Rapid disassembly/assembly of the movable blocks of bottom formwork;
•Self-propelled running of internal formwork;
•Prefabricated box girder formwork and complete set of tooling system.
•Rapid disassembly/assembly of the movable blocks of bottom formwork;
•Self-propelled running of internal formwork;
•Prefabricated box girder formwork and complete set of tooling system.
EXTENSIVE EXPERIENCE
•Formworks for various bridge types have been designed, such as Q2325, Q2322, Q2229 and used in plenty of projects, for instance, high-speed railways, passenger dedicated lines, highways, intercity rail transits, municipal works, cross-sea bridges, etc.
•Formworks for various bridge types have been designed, such as Q2325, Q2322, Q2229 and used in plenty of projects, for instance, high-speed railways, passenger dedicated lines, highways, intercity rail transits, municipal works, cross-sea bridges, etc.
The one-step fully hydraulic automatic mold retraction of the internal mold :
No need for personnel to enter the inner cavity of the beam body during the mold retraction process, which saves time and labor, and is safe and efficient.
The main girder:
The main beam uses upper structure, with rails, which has high rigidity, and provides enough space under botton formwork for the operator.
The "automatic longitudinal moving device of internal mold":
Optional for automatic longitude moving device of inner formwork, which replaces the traditional method by winch, and makes the operation easier and safer.
About WuXin
Hunan Wuxin Intelligence Technology Co., Ltd was established in September 2005 and is a highly professional supplier in the field of overall solutions for road and bridge construction technology. Relying on 20 years of factory operation experience, Wuxin Technology now has more than 1,400 employees.
The company centers on developing intelligent, equipment-centered, and standardized formwork, providing customers with efficient, safe, and convenient products, solutions, and services. Its business spans railways, highways, cross-sea bridges, rail transit, and municipal construction. The designed and manufactured products like information-based prefabricated production lines for bridge components, various beam and pier templates, vehicle and trestle bridges have been used in many key projects globally.
Representative projects of product application:
High-speed railway projects: Jakarta-Bandung High-Speed Railway in Indonesia, Menghua, Shanghai-Kunming, Xiong'an-Guangzhou High-Speed Railway, etc., which vividly demonstrate our active participation in international high-speed rail construction.
Highway projects: Beijing-Hong Kong-Macao, Guangzhou-Shenzhen, Hangzhou-Shaoxing-Ningbo, Shangri-La, etc., with a portion of projects also showing our influence in the international highway domain.
Urban rail transit projects: Changsha Maglev (MLF), Fenghuang Maglev (MLF), Shanghai Metro, Nanjing Metro, etc., and some of our technologies and products have also been introduced and applied in international urban rail transit systems.
Cross-sea bridge projects: Hong Kong-Zhuhai-Macao Bridge, Main Channel of Zhoushan Port, Quanzhou Bay Cross-sea Bridge, Yueqing Bay Cross-sea Bridge, etc., where our cross-sea bridge solutions have made significant contributions and have also been recognized and adopted in international bridge construction projects.
Overseas projects: Jakarta-Bandung High-Speed Railway in Indonesia, Padma Bridge in Bangladesh, Kimpi Bridge in Zambia, Mombasa-Nairobi Railway, China-Laos Kunming Railway, etc. These overseas projects distinctly highlight our extensive international business scope and strong competitiveness in the global market.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.
Q: What is your terms of payment ?
A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.
- Similar Products
$40.00
200 Pieces (MOQ)
Waterproof PP Plastic Formwork for Construction
Zhanjiang Kingstar Building Material Co., Ltd.
$56.69
100 Square Meters (MOQ)
Combined Ribbed Plastic Building Formwork 60cm Wide
Hebei Leige Technology Development Co., Ltd.