Swipe or use the arrows to view product images.
Marble Surface Slate Sintered Stone Top Modern Bulgaria Grey Color Ceramic Table with Metal Base Dining Table Sets
| Price | $159.00 |
|---|---|
| Min Order | 30 Pieces |
| Availability | In Stock |
| Shipping From | Tianjin, China |
| Popularity | 512 people viewed |
Model NO.:
OKT-2313
Style:
Modern
Material:
Ceramic or Sintered Stone
Usage:
Hotel, Home, Restaurant
Shape:
Rectangle
Folded:
Unfolded
Rotary:
Fixed
Color:
Marble
Customized:
Customized
Condition:
New
Size:
Many Sizes Available
Table Top:
Ceramic (High Gloss or Matt)
MOQ:
30PCS
Packing:
1PCS/3CTN
Fob Port:
Xingang, Tianjin
Delivery Time:
30-45days After Order Confirmed
Legs:
Metal Legs with Powder Coating
Trademark:
OKAY
Transport Package:
High Quality Carton
Specification:
130*70, 140*80, 160*90, 180*90
Origin:
China
HS Code:
9403609990
Product Description
| Product Name | Ceramic table | MOQ | 30pcs |
| Model No. | OKT-2313 | Packing | 1pc/3ctns |
| Brand | OKAY | VOL | 0.3-0.35 |
| Table top | Ceramic(high gloss or matt) | 40HQ Load ability | 200-250pcs |
| Mid function | Fixed table | FOB port | Xingang, Tianjin |
| Size | 130*70,140*80,160*90,180*90 | Delivery time | 30-45 days |
Packing
FAQ
1. How about your quality ?
We have QC department, they control every process, start from purchasing raw material to finish the goods and loading the container.
2. What is your MOQ ?
Usually 200 pcs per model for chairs and 50 pcs per model for tables .
3. If we want a sample, how much do we need to pay ?
We usually charge 2 times price, and the transport fee should be paid by buyer, we will reture the extra money when you place order.
4. Where is your factory locate? How can I visit it ?
Our factory is located in Shengfang town, Bazhou, Hebei province, China. It takes just one hour to our factory from Tianjin Airport. We can pick you up from Tianjin Airport or Beijing Airport.
5. Do you participate in any exhibition ?
Yes, we participate in Canton Fair, China International Furniture Expo in Guangzhou and Shanghai every year. You are very welcomed to visit our booth.
6. What is the leading time for mass production ?
It depends on the order quantity and the product. Usually our leading time is 30-45 days for one container after order confirmed.
If you have any interest, please feel free to contact us. Thank you !
- Similar Products