Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Metal Feet Imported Ceramic Top Retractable Extendable Long Dining Table Sintered Stone Table

Price $179.00
Min Order 10 Pieces
Availability In Stock
Shipping From Tianjin, China
Popularity 302 people viewed
Model NO.:
OKT-2312
Style:
Modern
Material:
Ceramic or Sintered Stone
Usage:
Hotel, Home, Restaurant
Shape:
Rectangle
Folded:
Unfolded
Rotary:
Extendable
Color:
High Gloss Grey Marble
Customized:
Customized
Condition:
New
Certificate:
FSC
Size:
Many Sizes Available
Table Top:
Ceramic
MOQ:
30PCS
Packing:
1PCS/2CTN
Fob Port:
Xingang, Tianjin
Delivery Time:
30-45days After Order Confirmed
Legs:
Metal with Black Painting
Trademark:
OKAY
Transport Package:
High Quality Carton
Specification:
(120+30+30)*80*76CM
Origin:
China
HS Code:
9403609990
Product Description
Product NameDining tableMOQ30pcs
Model No.OKT-2312Packing1pc/3ctns
BrandOKAYVOL0.33
Table topCeramic or Sintered stone40HQ Load ability210pcs
Mid functionTwo side extensionFOB portXingang, Tianjin
Size(120+30+30)*80*76CMDelivery time30-45 days
 









FAQ

1. How about your quality ?
We have QC department, they control every process, start from purchasing raw material to finish the goods and loading the container.

2. What is your MOQ ?
Usually 200 pcs per model for chairs and 50 pcs per model for tables .

3. If we want a sample, how much do we need to pay ?
We usually charge 2 times price, and the transport fee should be paid by buyer, we will reture the extra money when you place order.

4. Where is your factory locate? How can I visit it ?
Our factory is located in Shengfang town, Bazhou, Hebei province, China. It takes just one hour to our factory from Tianjin Airport. We can pick you up from Tianjin Airport or Beijing Airport.

5. Do you participate in any exhibition ?
Yes, we participate in Canton Fair, China International Furniture Expo in Guangzhou and Shanghai every year. You are very welcomed to visit our booth.

6. What is the leading time for mass production ?
It depends on the order quantity and the product. Usually our leading time is 30-45 days for one container after order confirmed.

If you have any interest, please feel free to contact us. Thank you !
  • Similar Products
Full Page Contact Supplier