$17.00
300 Pieces (MOQ)
Heavy-Duty Industrial Corner Storage Shelf for Garage Warehouse
Qingdao Besto Industrial Co., Ltd.
Swipe or use the arrows to view product images.
Metal Warehouse Storage Automatic Radio Shuttle Rack
| Price | $1.80 |
|---|---|
| Min Order | 3000 kg |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 390 people viewed |
Model NO.:
SPR-003
After-sales Service:
24/7 Hours on Line
Warranty:
3 Years
Usage:
Tool Rack, Beverage, Clothing, Tools, Supermarket, Food, Industrial, Warehouse Rack
Material:
Steel
Structure:
Rack
Type:
Drive-In Pallet Racking
Mobility:
Fixed
Height:
5-15m
Weight:
500kg-1500kg
Closed:
Closed
Development:
New Type
Serviceability:
Common Use
Surface Treatment:
Powder Coating
Feature:
Corrosion Protection
Color:
Customized
Trademark:
KAKU
Transport Package:
Packed in Bundles with Pallets
Specification:
suitable for 1200*1000 Standard pallet
Origin:
Nanjing
HS Code:
7308900000
Product Description
Metal Warehouse Storage Automatic Radio Shuttle Rack
Shuttle rack system is a storage system composed of high density storage racking, shuttle and forklift. This new concept storage racking system is more powerful in operation than that of traditional storage racking, which enable it to take advantage of warehouse space sufficiently. The space utilization rate is more than 80%.Features of Shuttle Racks
Pallet-loading:
When loading, the pallets are placed at the front of the racking tunnel rail by forklift. By the radio remote control operation, the shuttle carries pallets running on the rail of racking.
Pallet-picking:
When Picking, the shuttle carries pallets from deep side to the front side of racking, the pallets are to be picked from the racking by forklift.
Shuttle-removing:
Shuttles can be removed by forklift to different tunnels of racking, one set of shuttle can be used for many racking tunnels. The quantity of shuttle depends on the depth of racking tunnels, goods, and frequency of goods picking, Etc.
Kaku Uprights
Business Information
| Model | Radio Shuttle Rack | |||||||||
| Pallet Size | A) W1200*D1000mm | B)W1200*D1200mm | C) W1200*D1100mm | D) W1200*D800mm | ||||||
| Materials Optional | A) Quality Steel Q235A used for normal temperature storage situation | |||||||||
| B) Quality Steel Q235B used for cold storage room | ||||||||||
| C) Environmental protection powder for surface treatment--powder coating | ||||||||||
| Craft-work | A) hole-punching | B) cold rolling | C) welding | D) powder coating | ||||||
| Structure | A) bolted structure | B) welded structure | ||||||||
| Color | A) as to our standard model | B) according to customer's requests | ||||||||
| Pack model | A) standard export packing | B) according to customer's requests | ||||||||
| Package material | A) transparent and dust-proof poly-sheet | |||||||||
| B) hard carton paper | ||||||||||
| C) long and thin plywood bar | ||||||||||
| D) plywood pallet; steel and plastic straps | ||||||||||
| E) air bag used when loading container | ||||||||||
| MOQ | 5-10 sets; the model is subject to your requirements | |||||||||
| Payment | A) T/T | B) LC | C) Paypal or Western Union | |||||||
| Warranty | A) one year against manufacturing defect | |||||||||
| B) offer lifetime consultation on problems occurred | ||||||||||
| Quantity | A) 20' container | B) 40' container | C) a sample order | |||||||
| 17500kgs | 26000kgs | 1 set | ||||||||
| Delivery time | In 15 days | In 20 days | In 7 days | |||||||
| Note | All racks can be customized | |||||||||
Production Procedure
Service Content
Please Provide Information for Quick Quotation
1. Pallet Size (Length*Width*Loading Height in mm).
2. Layout or Dimension (Length*Width*Net Height mm) of your warehouse.
3. Rack Size (Length*Width*Depth in mm if available,if not, we shall design for you).
4. How many bays and levels if available.
5. Loading Capacity(kg) of each pallet if available.
FAQ
a: May I know the status of my order?
We will send you photos or video to help you understand.
b: Quick manufacturing time
For Normal orders, we suppose to finish within 15 working days.
As a manufacturer, we can ensure the delivery time according to the formal contract.
c: What is delivery times?
Normally, delivery time is within 20 workdays.
d: What is the term of payment?
T/T: 30% deposit in advance after confirmed order,
70% balance payment before shipment
WESTERN UNION, PAYPAL
Factory Photos
- Similar Products