Swipe or use the arrows to view product images.
Multidirectional Ring Lock Scaffolding System Steel Frame Scaffold Quick Erection & Dismantle
| Price | $20.00 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 259 people viewed |
Model NO.:
ST370
Material:
Steel
Type:
Fixed
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Floor Type Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
External Scaffolding
Move Method:
Installed and Fixed
Scaffolding Part Type:
Ringlock Scaffolding Parts
Construction Properties:
Building Scaffold
Surface Treatment:
Hot DIP Galvanized/Pre-Galvanized
OEM/ODM:
Available
Validity:
More Than 20 Years
Thickness:
2.75mm/3.2mm
Delivery:
About 20-30 Days After Deposit
Factory Certificate:
ISO9001 ISO4001 ISO45001
Certificate:
Ce /SGS
Application:
Building/Tunnel/Bridge Construction
Raw Material:
Steel Q355b,Q235B,Q195
Color:
Silver Red Blue Grey
Connect Method:
Wedge Lock/Ring Lock
Way of Quoting:
by Piece or by Weight
Sample:
Available
Business Type:
Manufacturer and Exporter
Loading Port:
Tianjin or Qingdao
Trademark:
HDRL
Transport Package:
Steel Rack
Specification:
500mm 1000mm 1500mm 2000mm 2500mm 3000mm
Origin:
China
HS Code:
73084000
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS certification.
Q5: Can I get some samples?
A: Yes, usually the customer will pay for the cost and freight charge.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
- Similar Products
$55.00
1000 Pieces (MOQ)
Galvanized Steel Scaffolding for Industrial Shoring
Cangzhou Zhite Building Materials Co., LTD
$3.10
1000 Pieces (MOQ)
Scaffolding Clamp British Type 48.3mm Pressed Beam Coupler
Rizhao Fast & Fasten Scaffold Co., Ltd.
$4.00
1000 Pieces (MOQ)
90DIN Anchor Wing Nut for Concrete Slab Formwork Tie Rod Rebar
Rizhao Weiye Tools Co., Ltd.