$35.00
100 Square Meters (MOQ)
Eastland AAC Wall Cladding Panel Alc Light Weight Wall Panel
Eastland Building Materials Co., Ltd.
Swipe or use the arrows to view product images.
New Product Sound Small Pile Breaking Machine
| Price | $6.20 |
|---|---|
| Min Order | 20 Pieces |
| Availability | In Stock |
| Shipping From | Fujian, China |
| Popularity | 467 people viewed |
Model NO.:
ES Type
After-sales Service:
Installation Guidance
Warranty:
6month
Quality Guarantee Period:
6month
Storage Environment:
Dry Environment
Product Specifications:
35mmw*600mml
Weight:
0.7kg
Trademark:
WYC
Transport Package:
Carton & Vacuum Packing
Specification:
720*150*200mm
Origin:
China
Product Description
PILE HEAD CUTTER("PHC")
| NAME | APPLICATION | PACKING | |
| PHC(ES) | Small cut pile head | Ф500mm-Ф800mm | 600×35mm×10pcs |
| PHC(S) | Large cut pile head | Ф900mm-Ф1200mm | 700×45mm×10pcs |
| PHC(B) | Large cut pile head | Ф1300mm or more | 550×70mm×10pcs |
| NAME | ACCESSORY | |
| For PHC(ES) | Bracket type ESB | The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head |
| For PHC(S) | Bracket type B | |
| For PHC(B) | Bracket type BB/DBB | |
| NAME | REMARKS |
| De-bonding foam for vertical reinforcement anchor bar | There are five sizes with a diameter of 16-40mm |
How the PHC Works
1. The bonding between concrete and steel is removed by covering all reinforcement bars with de-bonding covers.
2. The PHC that is installed with the water in the concrete and expand. The expansion will cause stresses in the concrete that has set. The expansive stresses will exceed that of the compressive stress of the concrete after 3 to 4 days and hence causing a crack in the pile head.
3. The cracking of the pile head at the position of the PHC will hardly propagate below the intended cracking line.
Components
1. PHC
a) Type ES-35mmWx600mml
b) Type S-45mmlWx700mml
c) Type B-70mmWx550mml
2. Steel Reinforcement De-Bonding Covers
Various sizes - From Φ16mm to Φ40mm 3. Steel Brackets
a) Type ESB
b) Type SB
c) Type BB
d) Type DBB
b) Type SB
c) Type BB
d) Type DBB
a) 5C-W130mm-L1100mm
b) 5C-W140mm-L1400mm
Installation Procedure
1. The PHC materials are fixed to the steel Reinforcement cage prior to lowering the cage into the bored hole for concerting.
2. The PHC are initially fitted to the steel brackets.
3. The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
4. Install de-bonding covers to all the steel Reinforcement starter bars above the PHC.
5. The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
2. The PHC are initially fitted to the steel brackets.
3. The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
4. Install de-bonding covers to all the steel Reinforcement starter bars above the PHC.
5. The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
Pile Head Removal
1. After concreting, wait 4 to 5 days for crack to form at the pile head.
2. When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.
CONFIGURATION OF PHC FOR EACH PILE SIZE
Q: Why choose our product?
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.
Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.
Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.
Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.
Q: How long is the shelf life of the product?
A: In a dry environment 6-8 month.
Q: Which country have you exported?
A: Most Southeast Asian countries.
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.
Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.
Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.
Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.
Q: How long is the shelf life of the product?
A: In a dry environment 6-8 month.
Q: Which country have you exported?
A: Most Southeast Asian countries.
- Similar Products
$900.00
10 Tons (MOQ)
Australian Galvanized Retaining Walls Steel for Construction
Qingdao Jiahexin Steel Co., Ltd.
Negotiable
3 Tons (MOQ)
Conch 50mm Series Casement Window Aluminum Profiles
Yingde Conch Profiles Co., Ltd.
$10.00
2000 Meters (MOQ)
Tecon Best Price Formwork I-Joist H20 LVL Timber Beam
Suzhou TECON Construction Technology Co., Ltd.
$140.00
300 Square Meters (MOQ)
Tecon Painting Steel Frame and Plywood Panel for Construction Formwork
Suzhou TECON Construction Technology Co., Ltd.
$3150.00
9 Tons (MOQ)
Conch 60 Casement Aluminum Plastic Doors and Windows Profile
Yingde Conch Profiles Co., Ltd.
$300.00
300 Square Meters (MOQ)
Tecon Reusable Aluminum Frame Formwork Alu-Deck Formwork for Concrete
Suzhou TECON Construction Technology Co., Ltd.